Annual Compliance Report for Buckland Dry Creek for holding pattern & residual operations.
Created: 07 Nov 2024 Revised: 07 Nov 2024

RY CREEK, natural salt flats originally reclaimed in 1894 when an embankment was constructed by hand during an unemployment relief program. ICI Australia Operations PL commenced operations in 1935. Construction of the saltfield commenced during...

RY CREEK, natural salt flats originally reclaimed in 1894 when an embankment was constructed by hand during an unemployment relief program. ICI Australia Operations PL commenced operations in 1935. Construction of the saltfield commenced during the post-depression period when up to 650 men were employed to build earth embankments over an area of >800 Ha, eventually reaching a nominal output of salt of ~100,000 tpa. Extensions to the original saltfield were made form the 1940s through to the 1970s, with full mechanisation completed 1946. Leases extended from near Adelaide, then along a coastal strip for 50 km to the NNW to Port Parham. Total area was >4,000 ha, inclusive of >400 Ha of evaporation ponds. ICI, after almost 50 years of production, sold the operation to Penrice Soda Products in 1989. In 2005 Cheetham (Dry creek) PL, now Ridley Dry creek PL acquired the tenure.

More +

About this record

Record No mesac28147
Topic Geoscientific Information
Type of Resource Document
Category Type Earth Sciences
Document Type Mineral Company Report - Mining Operation Compliance
Contributor
Sponsor
Tenement
Tenement Holder
Operator Buckland Dry Creek Pty Ltd
Geological Province
    Mine Name Dry Creek Salt Fields
    Stratigraphy
    Commodity
      Notes
      Doc No: MCR 4000029

      Doc No: MCR 4000029

      Language English
      Metadata Standard ISO 19115-3

      Citations

      Use constraints License
      License Creative Commons Attribution 4.0
      Persistent identifier https://pid.sarig.sa.gov.au/document/mesac28147
      Citation Annual Compliance Report for Buckland Dry Creek for holding pattern & residual operations. Mineral Company Report - Mining Operation Compliance
      https://pid.sarig.sa.gov.au/document/mesac28147

      Technical information

      Status
      Maintenance and Update Frequency
      Geographic Reference GDA2020 (EPSG:7844)
      Geo bounding box {"type":"Polygon","coordinates":[[[138.5,-35],[139,-35],[139,-34.5],[138.5,-34.5],[138.5,-35]]]}
      Purpose
      
                          
                          
      
                          
                        
      Lineage