Mount Pleasant, Birdwood and Hartley. Joint second partial surrender report, for the period 30/7/1985 to 29/2/1988.
Downloads
Name | Description | Download | Select |
---|---|---|---|
Mount Pleasant, Birdwood and Hartley. Joint second partial surrender report, for the period 30/7/1985 to 29/2/1988. |
About this record
Record No | mesac31887 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type | |
Document Type | Mineral Company Report - Mineral Exploration |
Contributor | |
Sponsor | |
Tenement | |
Tenement Holder | Esso Exploration and Production Australia, Inc.;Nede Pty Ltd |
Operator | Esso Australia Ltd. Minerals Department;City Resources Ltd |
Geological Province | Kanmantoo Trough |
Mine Name | |
Stratigraphy | |
Commodity | |
Notes |
Notes: 56% of the former area of EL 1296, 49% of EL 1340 and 95% of EL 1341 have been relinquished (for a combined total of 1064 square km). In September 1985, an airborne multispectral scanning survey was flown over much of the now relinquished...
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac31887 |
Citation | O'Neill, D. Mount Pleasant, Birdwood and Hartley. Joint second partial surrender report, for the period 30/7/1985 to 29/2/1988. Mineral Company Report - Mineral Exploration https://pid.sarig.sa.gov.au/document/mesac31887 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[138.5,-35.5],[139.5,-35.5],[139.5,-34.5],[138.5,-34.5],[138.5,-35.5]]]} |
Purpose | |
Lineage |