Togo Dam. Progress and final reports to licence surrender for the period 9/1/1991 to 19/3/1993.
Published: 06 May 1993 Created: 13 Nov 2024 Revised: 13 Nov 2024

Exploration for Hunters Dam style stratiform lead-zinc mineralisation in the Benagerie area, in geochemically anomalous Palaeoproterozoic basement units equivalent to the Bimba Formation of the Willyama Supergroup, which overlies the magnetite -...

Exploration for Hunters Dam style stratiform lead-zinc mineralisation in the Benagerie area, in geochemically anomalous Palaeoproterozoic basement units equivalent to the Bimba Formation of the Willyama Supergroup, which overlies the magnetite - rich Upper Albite Formation, comprised the acquisition of 43 line km of ground magnetics over the flanks of regional magnetic highs, plus trial RAB drilling (2 holes, total 48 m). The open hole air drilling technique used failed to penetrate the Tertiary/Cretaceous clayey cover. A planned replacement aircore drilling programme (60 holes for an estimated total penetration of 4260 m) was not performed before a decision was made by Mount Isa Mines to cease tenure owing to six months of unsuccessful farm-out attempts, thus leaving the targeted residual magnetic anomalies untested.

More +

About this record

Record No mesac32980
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mineral Exploration
Contributor
Sponsor
Tenement EL 1695
Tenement Holder Mount Isa Mines Ltd
Operator MIM Exploration Pty Ltd
Geological Province
Mine Name
Stratigraphy
Commodity copper
Notes
Geographic Locality: Togo Dam;Billeroo Tank;Eurinilla Creek;Lake Charles
Doc No: Env 08416
Drillhole: RABT001;RABT002

Geographic Locality: Togo Dam;Billeroo Tank;Eurinilla Creek;Lake Charles Doc No: Env 08416 Drillhole: RABT001;RABT002

Language English
Metadata Standard ISO 19115-3

Citations

Use constraints License
License Creative Commons Attribution 4.0
Persistent identifier https://pid.sarig.sa.gov.au/document/mesac32980
Citation Binks, P.J.;Kerr, I.D. 1993. Togo Dam. Progress and final reports to licence surrender for the period 9/1/1991 to 19/3/1993. Mineral Company Report - Mineral Exploration
https://pid.sarig.sa.gov.au/document/mesac32980

Technical information

Status
Maintenance and Update Frequency
Geographic Reference GDA2020 (EPSG:7844)
Geo bounding box {"type":"Polygon","coordinates":[[[140.5,-31.5],[141,-31.5],[141,-31],[140.5,-31],[140.5,-31.5]]]}
Purpose

                    
                    

                    
                  
Lineage