PEL 42. Progress and technical reports for the period September 1989 to February 1993.
Published: 23 Feb 1993 Created: 13 Nov 2024 Revised: 13 Nov 2024

The operator completed the Year One geophysical and geological data review, but the seismic reprocessing project and a subsequent Year Two commitment to acquire new seismic, later varied to be the conduct of a soil geochemical survey, were not...

The operator completed the Year One geophysical and geological data review, but the seismic reprocessing project and a subsequent Year Two commitment to acquire new seismic, later varied to be the conduct of a soil geochemical survey, were not carried out due to lack of funds. At the end of Year Two the licensees relinquished areas in the north and east of the tenement to make it more attractive to farmin offers, but as none eventuated they were obliged to surrender their tenure in early 1993 when a drilling undertaking was also imminent.

More +

About this record

Record No mesac34119
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Energy Company Report - Annual licence or technical report
Contributor South Australia. Department of Mines and Energy
Sponsor
Tenement PEL 42
Tenement Holder Anzoil NL;Fossil Cliff Oil Pty Ltd
Operator Anzoil NL
Geological Province
Mine Name Killumi Prospect
Stratigraphy
Commodity
    Notes
    Notes: Had to be scanned from original microfische
    Geographic Locality: Simpson Desert;South Australia
    Doc No: Env 08079
    Drillhole: Poolowanna 1;Oolarinna 1;Killumi 1

    Notes: Had to be scanned from original microfische Geographic Locality: Simpson Desert;South Australia Doc No: Env 08079 Drillhole: Poolowanna 1;Oolarinna 1;Killumi 1

    Language English
    Metadata Standard ISO 19115-3

    Citations

    Use constraints License
    License Creative Commons Attribution 4.0
    Persistent identifier https://pid.sarig.sa.gov.au/document/mesac34119
    Citation Klunder, J.H.C.;Harrison, M.R.;Marshall, J.L.C.;Munks, E. 1993. PEL 42. Progress and technical reports for the period September 1989 to February 1993. Energy Company Report - Annual licence or technical report
    https://pid.sarig.sa.gov.au/document/mesac34119

    Technical information

    Status
    Maintenance and Update Frequency
    Geographic Reference GDA2020 (EPSG:7844)
    Geo bounding box {"type":"Polygon","coordinates":[[[136.5,-27.5],[137.5,-27.5],[137.5,-26],[136.5,-26],[136.5,-27.5]]]}
    Purpose
    
                        
                        
    
                        
                      
    Lineage