EPP 25. Progress, technical and surrender reports for the period March 1991 to October 1995.
Downloads
Name | Description | Download | Select |
---|---|---|---|
EPP 25. Progress, technical and surrender reports for the period March 1991 to October 1995. |
About this record
Record No | mesac34312 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | Energy Company Report - Annual licence or technical report |
Contributor | |
Sponsor | |
Tenement | EPP 25 |
Tenement Holder | BHP Petroleum (Vic.) Pty Ltd;INPEX South Lincoln Ltd;Deilmann Oil and Gas Pty Ltd |
Operator | BHP Petroleum Pty Ltd |
Geological Province | |
Mine Name | Borda Prospect;Vivonne Prospect |
Stratigraphy | |
Commodity | |
Notes |
Notes: Permit surrender report is indexed separately. Geographic Locality: Southern Ocean;1983 D83 Marine Seismic Survey;1984 D84 Marine Seism ic Survey;1991 DH91 Marine Seismic Survey;1992 DH92 Marine Seismic Survey;1992 Borda Site Survey;1992...
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac34312 |
Citation | Marlow, R.B.;Durham, M.S.;Nicholls, P.;James, C.L.;Lasker, B.D.;Messent, B. EPP 25. Progress, technical and surrender reports for the period March 1991 to October 1995. Energy Company Report - Annual licence or technical report https://pid.sarig.sa.gov.au/document/mesac34312 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[135.5,-37],[137,-37],[137,-35],[135.5,-35],[135.5,-37]]]} |
Purpose | |
Lineage |