Proposal to relinquish permit EPP 21, South Australia.
Downloads
Name | Description | Download | Select |
---|---|---|---|
Proposal to relinquish permit EPP 21, South Australia. |
About this record
Record No | mesac34415 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | Energy Company Report - Annual licence or technical report |
Contributor | |
Sponsor | |
Tenement | EPP 21 |
Tenement Holder | BP Petroleum Development Ltd;South Australian Oil and Gas Corp. Pty Ltd;Diamond Shamrock Oil Co. (Aust.) Pty Ltd |
Operator | BP Petroleum Development Ltd |
Geological Province | Duntroon Basin |
Mine Name | Numbat South Prospect;Numbat Northeast Prospect;Numbat (Duntroon) Prospect;Koala Prospect;Cockatoo Prospect;Numbat West lead;Numbat East lead;Numbat Southeast (a) lead;Numbat Southeast (b) lead;Lead D;Lead E;Lead F |
Stratigraphy | |
Commodity | coal |
Notes |
Geographic Locality: Southern Ocean;Inner Basin;Central High;Outer Step-faulted Zone Doc No: Env 06215 R 17 p: 660-692 Drillhole: Duntroon 1;Platypus 1;Echidna 1 Drillhole Unit No: 5926 00001
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac34415 |
Citation | Allan, R.M.;Tupper, N.P. Proposal to relinquish permit EPP 21, South Australia. Energy Company Report - Annual licence or technical report https://pid.sarig.sa.gov.au/document/mesac34415 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[135,-35],[135.5,-35],[135.5,-34.5],[135,-34.5],[135,-35]]]} |
Purpose | |
Lineage |