Polda Basin. Progress and final reports from 18/3/86 to 8/9/86, including bore hole study.
Downloads
Name | Description | Download | Select |
---|---|---|---|
Polda Basin. Progress and final reports from 18/3/86 to 8/9/86, including bore hole study. |
About this record
Record No | mesac36041 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type | |
Document Type | Energy Company Report - Annual licence or technical report |
Contributor | Petroleum Management Associates Pty Ltd |
Sponsor | |
Tenement | PEL 35 |
Tenement Holder | Continental Oil Exploration Pty Ltd |
Operator | Continental Oil Exploration Pty Ltd |
Geological Province | Polda Basin |
Mine Name | |
Stratigraphy | |
Commodity | |
Notes |
Geographic Locality: Eyre Peninsula Doc No: Env 06671
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac36041 |
Citation | 1986. Polda Basin. Progress and final reports from 18/3/86 to 8/9/86, including bore hole study. Energy Company Report - Annual licence or technical report https://pid.sarig.sa.gov.au/document/mesac36041 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[135,-34.5],[135.5,-34.5],[135.5,-34],[135,-34],[135,-34.5]]]} |
Purpose | |
Lineage |