Pillaworta Hill. Progress and final reports for the period 22/12/1976 to 4/9/1978.
Downloads
Name | Description | Download | Select |
---|---|---|---|
ENV02926.pdf |
About this record
Record No | mesac5531 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | Mineral Company Report - Mineral Exploration |
Contributor | |
Sponsor | |
Tenement | EL 276 |
Tenement Holder | CRA Exploration Pty Ltd |
Operator | |
Geological Province | Gawler Craton |
Mine Name | Port Lincoln mine;Burrawing copper mine;Tumby Bay talc mines;Koppio graphite mine |
Stratigraphy | |
Commodity | |
Notes |
Geographic Locality: Pillaworta Hill;Waterfall Gully;Mine Creek;Bosom Gully;Rock Valley Creek;Knott Hill;Tattalenghi Gully;"Koppio Jaspilite Complex" Doc No: Env 02926 Drillhole: KD3;KD4;PH1 - PH7
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac5531 |
Citation | McConachy, T.F.;Buckle, P.A. 1978. Pillaworta Hill. Progress and final reports for the period 22/12/1976 to 4/9/1978. Mineral Company Report - Mineral Exploration https://pid.sarig.sa.gov.au/document/mesac5531 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[135.5,-34.5],[136.5,-34.5],[136.5,-34],[135.5,-34],[135.5,-34.5]]]} |
Purpose | |
Lineage |