RB 68/00109 Substation Mount Barker geological investigations. Progress report no. 1 design stage, secn 4470 Hd Macclesfield - ETSA.
Downloads
Name | Description | Download | Select |
---|---|---|---|
RB 68/00109 Substation Mount Barker geological investigations. Progress report no. 1 design stage, secn 4470 Hd Macclesfield - ETSA. |
About this record
Record No | rb6800109 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | Departmental Publication - Engineering Geology Publication |
Contributor | |
Sponsor | |
Tenement | |
Tenement Holder | |
Operator | |
Geological Province | |
Mine Name | |
Stratigraphy | |
Commodity | |
Notes |
Notes: 69/00708 Geographic Locality: Mount Barker;Hd Macclesfield, secn 4470 Doc No: RB 68/00109
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/rb6800109 |
Citation | Boucaut, W.R.P. 1969. RB 68/00109 Substation Mount Barker geological investigations. Progress report no. 1 design stage, secn 4470 Hd Macclesfield - ETSA. Departmental Publication - Engineering Geology Publication. Government of South Australia. https://pid.sarig.sa.gov.au/document/rb6800109 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[138.5,-35.5],[139,-35.5],[139,-35],[138.5,-35],[138.5,-35.5]]]} |
Purpose | |
Lineage |