RB 68/00109 Substation Mount Barker geological investigations. Progress report no. 1 design stage, secn 4470 Hd Macclesfield - ETSA.
Published: 01 Jan 1969 Created: 05 Nov 2024 Revised: 05 Nov 2024

The Electricity Trust of South Australia is to construct a sub-station at Mount Barker. The single storey building of about 39 squares will be of modular block construction. The site was explored by 2 test pits 7 and 8 feet deep. The ground...

The Electricity Trust of South Australia is to construct a sub-station at Mount Barker. The single storey building of about 39 squares will be of modular block construction. The site was explored by 2 test pits 7 and 8 feet deep. The ground surface at the site is gently sloping (at about 3°). The ground surface if formed of organic sandy silt. The test pits showed this topsoil to be about 0.7 feet thick overlying red-brown clay soil of high plasticity, developed over weathered sandstone and schist bedrock. Rock is 2.6 feet below the ground surface in Pit 1 and 1.7 feet in Pit 2. The upper 1 feet of rock is extremely weathered to a clay soil of low plasticity, sandy in parts. The clay soil horizon developed over bedrock, in Pit 2 is reason-ably strong but the similar horizon in Pit 1 is much weaker. In both pits it appears to be of the expansive type, that is, subject to seasonal swelling and shrinking movements of fairly severe magnitude. Several alternative footing types, which have proved suitable for domestic homes under similar conditions, are described.

More +

About this record

Record No rb6800109
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Departmental Publication - Engineering Geology Publication
Contributor
Sponsor
Tenement
Tenement Holder
Operator
Geological Province
    Mine Name
    Stratigraphy
    Commodity
      Notes
      Notes: 69/00708
      Geographic Locality: Mount Barker;Hd Macclesfield, secn 4470
      Doc No: RB 68/00109

      Notes: 69/00708 Geographic Locality: Mount Barker;Hd Macclesfield, secn 4470 Doc No: RB 68/00109

      Language English
      Metadata Standard ISO 19115-3

      Citations

      Use constraints License
      License Creative Commons Attribution 4.0
      Persistent identifier https://pid.sarig.sa.gov.au/document/rb6800109
      Citation Boucaut, W.R.P. 1969. RB 68/00109 Substation Mount Barker geological investigations. Progress report no. 1 design stage, secn 4470 Hd Macclesfield - ETSA. Departmental Publication - Engineering Geology Publication. Government of South Australia.
      https://pid.sarig.sa.gov.au/document/rb6800109

      Technical information

      Status
      Maintenance and Update Frequency
      Geographic Reference GDA2020 (EPSG:7844)
      Geo bounding box {"type":"Polygon","coordinates":[[[138.5,-35.5],[139,-35.5],[139,-35],[138.5,-35],[138.5,-35.5]]]}
      Purpose
      
                          
                          
      
                          
                        
      Lineage