RB 71/00185 Construction material, Port MacDonnell breakwater - Minister of Marine.
Published: 16 Nov 1971 Created: 06 Nov 2024 Revised: 06 Nov 2024

The construction of a stone-mound breakwater at Fort MacDonnell will require about 100,000 to 170,000-tons of suitable stone. Individual blocks should be about 5 tons in weight, and an amount as yet unspecified should contain individual blocks...

The construction of a stone-mound breakwater at Fort MacDonnell will require about 100,000 to 170,000-tons of suitable stone. Individual blocks should be about 5 tons in weight, and an amount as yet unspecified should contain individual blocks which range, in weight /from 5 to 10 tons. Potential sources of breakwater construction material in the immediate area, surrounding Port MacDonnell have been investigated by Pain (1970). His report shows that there are two deposits containing some suitable' material: These are the base. lt at Mt. Schank about 8 miles from Port MacDonnell and the dolomite at Up and Down Rocks about 35 miles from Port MacDonnell. Engineers concerned with the project have cast serious doubts on the availability of suitable rock of the right size from Mt. Schank, and much of the material from Up and Down Rocks may be below size due to thin bedding and irregular dolomitisation. Because no suitable deposits are definitely known within 30 miles of Port MacDonnell it is appropriate at this stage to set down brief comment's on the nature and locality of all the known construction materials within a reasonable distance of the port. The selection of one or more deposits for further testing will then depend upon engineering feasability studies of the more interesting deposits. The deposits are shown on the accompanying locality map.

More +

About this record

Record No rb7100185
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Departmental Publication - Geological Survey Geoscience Publication
Contributor
Sponsor
Tenement
Tenement Holder
Operator
Geological Province
    Mine Name
    Stratigraphy Gambier Limestone
    Commodity
    Notes
    Notes: 69/01062
    Geographic Locality: Port MacDonnell
    Doc No: RB 71/00185

    Notes: 69/01062 Geographic Locality: Port MacDonnell Doc No: RB 71/00185

    Language English
    Metadata Standard ISO 19115-3

    Citations

    Use constraints License
    License Creative Commons Attribution 4.0
    Persistent identifier https://pid.sarig.sa.gov.au/document/rb7100185
    Citation Firman, J.B. 1971. RB 71/00185 Construction material, Port MacDonnell breakwater - Minister of Marine. Departmental Publication - Geological Survey Geoscience Publication. Government of South Australia.
    https://pid.sarig.sa.gov.au/document/rb7100185

    Technical information

    Status
    Maintenance and Update Frequency
    Geographic Reference GDA2020 (EPSG:7844)
    Geo bounding box {"type":"Polygon","coordinates":[[[140.5,-38.5],[141,-38.5],[141,-38],[140.5,-38],[140.5,-38.5]]]}
    Purpose
    
                        
                        
    
                        
                      
    Lineage