RB 80/00072 Quartzite deposit - Tanunda (Private Mine 205), pt section 512 Hd Nuriootpa.
Published: 01 Jul 1980 Created: 06 Nov 2024 Revised: 06 Nov 2024

Quartzite quarried by David Linke Contractors Pty Ltd is used as pavement material in road construction. It has inferred reserves to a depth of 5 metres of 100 000 tonnes.

Quartzite quarried by David Linke Contractors Pty Ltd is used as pavement material in road construction. It has inferred reserves to a depth of 5 metres of 100 000 tonnes.

About this record

Record No rb8000072
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Departmental Publication - Geological Survey Geoscience Publication
Contributor
Sponsor
Tenement PM 205
Tenement Holder
Operator
Geological Province Adelaide Geosyncline
Mine Name
Stratigraphy Sturt Tillite
Commodity industrial material
Notes
Geographic Locality: Tanunda;Hd Nuriootpa, secn 512
Doc No: RB 80/00072

Geographic Locality: Tanunda;Hd Nuriootpa, secn 512 Doc No: RB 80/00072

Language English
Metadata Standard ISO 19115-3

Citations

Use constraints License
License Creative Commons Attribution 4.0
Persistent identifier https://pid.sarig.sa.gov.au/document/rb8000072
Citation Keeling, J.L. 1980. RB 80/00072 Quartzite deposit - Tanunda (Private Mine 205), pt section 512 Hd Nuriootpa. Departmental Publication - Geological Survey Geoscience Publication. Government of South Australia.
https://pid.sarig.sa.gov.au/document/rb8000072

Technical information

Status
Maintenance and Update Frequency
Geographic Reference GDA2020 (EPSG:7844)
Geo bounding box {"type":"Polygon","coordinates":[[[138.5,-35],[139,-35],[139,-34.5],[138.5,-34.5],[138.5,-35]]]}
Purpose

                    
                    

                    
                  
Lineage