RB 83/00025 Beachport town water supply, well no. 4 completion report.
Published: 01 Apr 1983 Created: 06 Nov 2024 Revised: 06 Nov 2024

Well drilled to 363 metres to the Dilwyn Formation confined aquifer system and completed as production well.

Well drilled to 363 metres to the Dilwyn Formation confined aquifer system and completed as production well.

About this record

Record No rb8300025
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Departmental Publication - Hydrogeological Publication
Contributor
Sponsor
Tenement
Tenement Holder
Operator
Geological Province Otway Basin
Mine Name
Stratigraphy
Commodity
    Notes
    Geographic Locality: Beachport
    Doc No: RB 83/00025
    Drillhole: Beachport 4

    Geographic Locality: Beachport Doc No: RB 83/00025 Drillhole: Beachport 4

    Language English
    Metadata Standard ISO 19115-3

    Citations

    Use constraints License
    License Creative Commons Attribution 4.0
    Persistent identifier https://pid.sarig.sa.gov.au/document/rb8300025
    Citation Smith, P.C. 1983. RB 83/00025 Beachport town water supply, well no. 4 completion report. Departmental Publication - Hydrogeological Publication. Government of South Australia.
    https://pid.sarig.sa.gov.au/document/rb8300025

    Technical information

    Status
    Maintenance and Update Frequency
    Geographic Reference GDA2020 (EPSG:7844)
    Geo bounding box {"type":"Polygon","coordinates":[[[140,-37.5],[140.5,-37.5],[140.5,-37],[140,-37],[140,-37.5]]]}
    Purpose
    
                        
                        
    
                        
                      
    Lineage