RB 84/00036 Happy Valley filtration plant. Progress report to November 1983.
Published: 01 May 1984 Created: 06 Nov 2024 Revised: 06 Nov 2024

Results of inspections and construction progress. Adequate foundations and safe batter slopes occur at all site excavations. Remedial measures only necessary in one section of cut-off trench. Leakage through the coffer dam is attributed to...

Results of inspections and construction progress. Adequate foundations and safe batter slopes occur at all site excavations. Remedial measures only necessary in one section of cut-off trench. Leakage through the coffer dam is attributed to incomplete piling closure.

More +

About this record

Record No rb8400036
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Departmental Publication - Engineering Geology Publication
Contributor
Sponsor
Tenement
Tenement Holder
Operator
Geological Province Adelaide Geosyncline
Mine Name
Stratigraphy
Commodity
    Notes
    Notes: Follow-on report from RB 81/030.
    Geographic Locality: Happy Valley
    Doc No: RB 84/00036

    Notes: Follow-on report from RB 81/030. Geographic Locality: Happy Valley Doc No: RB 84/00036

    Language English
    Metadata Standard ISO 19115-3

    Citations

    Use constraints License
    License Creative Commons Attribution 4.0
    Persistent identifier https://pid.sarig.sa.gov.au/document/rb8400036
    Citation Beal, J.C. 1984. RB 84/00036 Happy Valley filtration plant. Progress report to November 1983. Departmental Publication - Engineering Geology Publication. Government of South Australia.
    https://pid.sarig.sa.gov.au/document/rb8400036

    Technical information

    Status
    Maintenance and Update Frequency
    Geographic Reference GDA2020 (EPSG:7844)
    Geo bounding box {"type":"Polygon","coordinates":[[[138.5,-35.5],[139,-35.5],[139,-35],[138.5,-35],[138.5,-35.5]]]}
    Purpose
    
                        
                        
    
                        
                      
    Lineage