-
RB 37/00077 Petrology of the cores of bores no. 1 and 2, Middleback Ranges.
A representative selection of rock types obtained in the cores of the DDH1 and DDH2 iron ore exploration holes was made with a view to studying the mineralogy, the lithology and any microstructures of interest present in the formations intersected. A...-
Document
Published: 05 Apr 1954
-
Data release [made at SA Director of Mines' discretion] : Tumby Bay. Annual reports [to the 24/11/2006 commencement of the Eyre Peninsula Project licences' combined reporting status] for the period 18/1/2002 to 17/1/2007.
Exploration Licence 2887 Tumby Bay was taken out to cover prospective magnetite rich Banded Iron Formations (BIF) close to the eastern coast of the Eyre Peninsula. Potential was seen for a magnetite concentrate export operation taking advantage of...-
Document
Published: 05 Mar 1907
-
Stony Hill (part of the Northern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 2/12/2004 to 23/12/2016.
During the life of the subject licence, the focus of exploration was to determine the area's potential for DSO haematite iron ore, with a secondary consideration being magnetite and haematite BIF. After conducting geophysical surveys and exploratory...-
Document
Published: 17 Jan 1917
-
Stony Hill. Combined annual/final report to licence full surrender, for the period 15/3/2016 to 14/3/2017.
No new work was carried out on the subject Stony Hill licence area during its past year. The South Australian Iron Ore Group Pty Ltd (SAIOG) has held this tenement (successively under ELs 3287/4451/5617) since 2/12/2004, but has now surrendered it in...-
Document
Published: 17 Jan 1917
-
Final Report - Unravelling the Stratigraphy of the Middleback Ranges ADI RD03-385 [Accelerated Discovery Initiative Round 3, 2023].
In 2022 SIMEC Mining/Onesteel Manufacturing Pty Ltd successfully applied for up to $270,000 of funding through the South Australian Government’s Accelerated Discovery Initiative (ADI) program. The company proposed to undertake RC and diamond drilling...-
Document
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 1918
-
Bull 033 The Geology and Iron Ore Resources of the Middleback Range Area
This report deals comprehensively with the physiography, prospect geology, and ore genesis, and includes an assessment of the iron ore reserves and other mineral resources of an area which has been almost the sole source of the iron ore used in...-
Document
-
ComRev 008 Iron Ore in South Australia 2000
The iron-rich rocks of South Australia have been classified into six deposit types - residual, chemical sedimentary iron formations, Fe-skarn and, of lesser significance, hydrothermal, clastic and magmatic. Production has been overwhelmingly from...-
Document
-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 1921
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Verran. Annual reports submitted until the commencement of joint venture project joint reporting, for the period 29/1/2010 to 28/1/2014.
An area located in the Cowell Hills is being explored for possible economic buried iron ore deposits. The desired commodity is DSO (Direct Shipping Ore) haematite mineralisation similar to that of the Middleback Range iron deposits, where pods of...-
Document
Published: 23 May 1914
-
Darke Peake. Progress reports for the period 15/6/79 to 27/9/82.
In a search for possible buried Palaeoproterozoic unconformity - related sedimentary uranium deposits over an area east of the Darke Range, an ongoing programme of exploratory work has included geological mapping at 1:25,000 scale, analysis of 205...-
Document