Lake Frome South, Central Lake Frome and Lake Frome North areas (the Lake Frome Potash Project). Joint annual reports plus final report to licences' joint full surrender, for the period 5/1/2015 to 26/4/2018.
The entire extent of the main Lake Frome salina was taken up in early 2015 with three contiguous licences covering a total area of 2718 square km, to explore for a salt lake brine potash resource which might be economic to develop to supply the local...-
Document
Published: 30 Apr 1918
-
Burra Copper [open pit mining] Project. Reports of geological investigations for the period October 1969 to February 1981.
A collection of miscellaneous reports referring to geochemical sampling of costeans and exposed bedrock, drilling, mapping and petrology work that has recently been carried out in the re-developed Burra open cut copper mine. The focus of the work...-
Document
Published: 21 Apr 1980
-
Lake Torrens Areas 1 and 2, Lake Torrens South and Lake Torrens North (the Lake Torrens Brine Potash Project). First joint annual report plus final report to licences' joint full surrender, for the period 5/1/2015 to 16/6/2016.
Much of the eastern side of the very large, 5,745 square km saline playa Lake Torrens, which occupies one of the most arid parts of Australia, was taken under licence by a Northern Territory - based company with the intent of systematically sampling...-
Document
Published: 14 Jun 1916
-
Pernatty Lagoon. First partial surrender report at licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Exploration conducted by CSR Ltd for possible economic stratiform base metal deposits in the western part of EL 81 addressed several targets, including Cattle Grid type disconformity - related copper mineralisation, Sweet Nell / MG14 type...-