-
RB 91/00057 Precambrian geology of islands in the Investigator Strait area, South Australia.
Exposures of Proterozoic rocks consist of coarse-grained, megacrystic granitoids plus dolerite and metadolerite dykes. This igneous association is correlated with the Donington Granitoid Suite and represents the southernmost exposure of the Gawler...-
Document
Published: 01 May 1991
-
RB 91/00110 Mafic dykes in the eastern Mount Lofty Ranges and Barossa Valley, South Australia. An excursion guide.
Mafic dykes and granitoid intrusions were emplaced around the southeastern margins of the Adelaide Foldbelt immediately prior to, during and following the Cambro-Ordovician (ca 500 Ma) Delamerian Orogeny, but are relatively uncommon elsewhere within...-
Document
Published: 01 Sep 1990
-
RB 93/00034 Palynological and dispersed cuticle report of KT-1, Port Broughton, Pirie Basin.
All 4 rotary mud drill cuttings samples examined from parts of the precollar hole depth interval 64 m to 148 m are Late Eocene - Oligocene in age.-
Document
Published: 01 Jul 1993
-
RB 93/00035 Pre-Adelaidean basement to the Stuart Shelf, South Australia: drillhole database and preliminary geological interpretation.
The geology and mineralisation of the prospective northeast segment of the Gawler Craton is the focus of the Stuart Shelf Basement Project. Geological and technical data from selected open-file drillholes (those that intersected pre-Adelaidean...-
Document
Published: 01 Sep 1993
-
RB 96/00018 Permanent gravity base station network. COOBER PEDY / TARCOOLA / BILLAKALINA / KINGOONYA.
A permanent gravity base station network was established in the Coober Pedy / Tarcoola area of the State. 58 new base stations and a number of company surveys were tied to the Australian Fundamental Gravity Network (AFGN) via Isogal stations at...-
Document
Published: 01 Jul 1996
-
RB 96/00021 Palynological dating and correlation of Mesozoic sediments from the ABMINGA 1:250 000 sheet, SA.
Palynological evidence indicates that all 13 submitted drill core sedimentary rock samples, excepting one (taken at 138.2 metres depth in hole A68-1), are late Aptian to earliest Albian in age. The sediments were deposited in environments ranging...-
Document
Published: 01 May 1996
-
Nature of the Kimban Orogeny across northern Eyre Peninsula.
There is no abstract created for this record-
Document
-
40Ar/39Ar dating of muscovite from a pegmatite in Kinchina quarry, near Murray Bridge.
There is no abstract created for this record-
Document
-
Monazite chemical dating via electron-probe micro-analysis.
This article provides a review of EPMA monazite dating theory together with a detailed description of the analytical method and procedures for the EPMA monazite dating technique developed at Adelaide Microscopy. To verify the accuracy of the method, a...-
Document
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Laboratory report on dating of samples collected near Immarna and Barton, western South Australia (Ooldea Project). [Commissioned by Geological Survey Branch].
Six samples of Quaternary dune sands taken from the Great Victoria Desert in the far west of South Australia were dated using new geochronological methods. The report explains the equipment and methodology used, and discusses the reliability of the...-
Document
Published: 03 Feb 1999
-
The Neales River Project. Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 17/5/2007 to 16/5/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
-
Elliston. Combined fourth annual and final report to licence expiry/full surrender, for the period 26/4/2002 to 25/4/2006.
An area situated immediately south-east of Elliston has been explored for diamonds, in conjunction with similar work being carried out by the joint venture on Flinders Island and on its adjoining Venus Bay, Colton and Polda mineral exploration...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
Olympic Dam Project. [Artesian] mound springs of the Lake Eyre South region [environmental] monitoring : half-yearly reports for the period from April 1998 to October 2005.
There is no abstract created for this record-
Document
-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document
-
Kanmantoo. Data release made in lieu of submitting a first partial surrender report at licence renewal [part]: progress reports and annual reports for the period 28/4/1992 to 31/7/1999. [Index Part 2 of 3].
When a third joint venture was entered into with Aberfoyle Resources Limited who assumed management of the tenement, the exploration targets changed to syngenetic, stratiform base metal sulphides hosted by gahnite-garnet meta-exhalatives. The...-
Document
Published: 22 Jul 1996
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document