-
Everard Park Homestead area (part of the Musgrave Project). Final report submitted at licence expiry/full surrender, for the period 19/10/2007 to 18/10/2014.
An area located near the south-eastern margin of the Musgrave Province, in the eastern and northern Everard Ranges about 100 km west-northwest of Marla, wholly within the APY Lands, has been explored for possible economic nickel-copper-platinoid group...-
Document
-
Data release - as updated : Florieton. Annual reports to the commencement of project licences' joint reporting, plus final report to licence full surrender, for the period 5/11/2007 to 18/2/2015.
During initial exploration of the Florieton area, located approximately 40 km south-east of Burra, the compilation and reprocessing of available gravity and magnetic data were used to interpret the bedrock geology hidden under a widespread 150-200 m...-
Document
-
North Deering Hills (Yalukula and Palatu). Annual reports to licence full surrender, for the period 20/10/1995 to 6/9/2003.
Mafic and ultramafic rocks of the Proterozoic Giles Complex, which have intruded highly metamorphosed basement units of the Musgrave Block in an area 380 km WNW of Marla, were considered to have potential to host massive Ni sulphide mineralisation,...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-35, Mount Woods Inlier, Kangaroo Dam platinoid metals mineral prospect. Project final report.
A programme of five diamond drillholes totalling 1740.6 m has recently been completed on EL 3445 at the Kangaroo Dam prospect, to follow up anomalous platinum and palladium metal values encountered within the Palaeoproterozoic metasedimentary basement...-
Document
-
EL 6783 Annual Technical Report to period ending 23/05/2023
Tri-Star Minerals Pty Ltd (Tri-Star) Annual Technical Report for Exploration Licence (EL) 6783, provides a summary of the activities undertaken on the tenement for the reporting period ending 23 May 2023. EL 6783 is located near the Tieyon area,...-
Document
Published: 23 Jun 2023
-
EL 6458 6783 Joint Annual Technical Report to period ending 08/11/2024
This report represents the Final Technical Report for EL 6458 and EL 6783. Originally Tri-Star was targeting coal resources within the Anderson Range Project. This focus shifted in 2021 to uranium conducive to insitu leaching, as well as metalliferous...-
Document
Published: 22 Nov 2024