South Warren Reservoir. Progress report to licence expiry for the period 10/10/1973 to 9/10/1974.
The Ukaparinga and Southern Hills prospects lie within EL 99, a small exploration tenement located near the Warren Reservoir, 20 km south-east of Gawler. The included Ukaparinga mine area is privately held under three mineral claims, over which...-
Document
Published: 20 Aug 1974
-
Mount Toodla. Data release made at licence expiry/renewal as a reduced area : annual reports for the period 12/4/2000 to 11/4/2005.
Exploration for possible buried Olympic Dam style Cu-Au-U-REE deposits in Proterozoic basement on the eastern flanks of the Peake and Denison Ranges, in an area located approximately 65 km south-east of Oodnadatta, has concentrated on a very large...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-27 - Endeavour Copper Gold Pty Ltd, Tarcoola Project, Harris Greenstone Domain magmatic nickel - prospective ultramafic targets. Drilling project final report.
The principal mineral exploration target for Endeavour Copper Gold Pty Ltd ('Endeavour') on the three subject Tarcoola Project exploration licences is nickel sulphide mineralisation hosted by Archaean ultramafic intrusive rocks within the Harris...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Torrens area. Annual reports for the period 6/4/2009 to 17/8/2018.
During the 2009-2010 reporting period, work completed by Straits included: • participation in Native Title and Land Access activities and negotiations, which have constituted the majority of the work undertaken; and • Holding numerous meetings and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles Nickel Project). Annual reports for the period 4/3/1999 to 23/9/2009.
A licence area located in South Australia's Far North-west Aboriginal Lands, and centred approximately 20 km to the south-east of the Surveyor Generals Corner at the borders of Western Australia, South Australia and the Northern Territory, has been...-
Document
-
Area within Tallaringa Conservation Park. Biennial reports and final report to licence full surrender, for the period 25/10/196 to December 2001.
Proterozoic and Archaean rocks of the Gawler Craton were the target hosts for gold and base metal mineralisation in the area of the eastern Tallaringa Conservation Park, west of Coober Pedy. Following an assessment of geological and geophysical data,...-
Document
-
Parakylia (part of the Theseus Project). Final report at licence full surrender, for the period 31/5/2012 to 1/7/2014.
Brownfields exploration for possible buried economic Mesoproterozoic IOCG type mineralisation within a licence area located ~45 km west of the Olympic Dam mine has consisted only of the interpretation of available geophysical data. Additional airborne...-
Document
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Manners Well. Combined first annual/final report to licence expiry/full surrender, for the period 2/10/2018 to 1/10/2019.
An intensely faulted and folded area centred ~65 km north-east of Parachilna, where extensive hydrothermal alteration is evident in the Neoproterozoic bedrock, and where considerable past small-scale surface mining activity has occurred, but where no...-
Document
-
West Lake Torrens (part of the Murdie Project). Final report for geophysical, drilling and logistics program, Project ADI RD01-120 [part of Accelerated Discovery Initiative Round 1, 2021].
ADI funding was granted by DEM to Kelaray to conduct approved geophysical surveys and exploratory drilling and apply logistical support within its Murdie Project, for a combined expenditure of up to A$320,000. At the outset of the project, Kelaray...-
Document
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Ruby Hill Project : Douglas Creek prospect drilling program. Final report, Project ADI RD02-288 [part of Accelerated Discovery Initiative Round 2, 2022].
Copper Search Australia Pty Ltd (a subsidiary of Copper Search Limited) was granted co-funding from the Department of Energy and Mining in July 2021 to a subsidy total of up to $228,000, to assist it with high risk exploration of remote parts of the...-
Document
-
[Predictions of] Water consumption at the Mount Gunson copper concentrator, township and mine, for a [proposed] 1515 tonnes per day operation.
Report estimates that the available water supply of 9.1 megalitres per week obtainable from Weapons Research Establishment and groundwater sources will be sufficient for the planned facilities. The further option of water recycling will effectively...-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document