-
Koonalda. Progress reports for the period 7/8/79 to 18/7/82.
Following an airborne magnetic/radiometric survey, two rotary percussion holes totalling 819 m were drilled on negative magnetic anomalies to reach pre-Mesozoic basement (gabbro and meta-sandstone) in the Koonalda area of the Nullarbor Plain. No...-
Document
-
Eucla Basin Stratigraphic Drilling Project. Well completion reports.
Four wells, drilled within 36 km of the Hughes and Denman Railway Sidings, explored for a possible Palaeozoic section and/or Upper Proterozoic or older basement, that was expected from Outback's regional gravity survey data to occur at or around...-
Document
-
RB 00843 Geology of the Maralinga area, South Australia.
Maralinga is located on the crest of the Ooldea Range, an ancient (Tertiary) coastal dune which is bounded to the south by the Nullarbor Plain and to the north by Tietkens Plain. The dune field of the Great Victoria Desert covers much of the region...-
Document
-
RB 70/00114 Groundwater survey, Nullarbor Station - M.G. and D. Thomas.
There is no abstract created for this record-
Document
Published: 01 Jan 1970
-
RB 70/00115 Groundwater survey, Yalata Lutheran Mission, Co. Hopetoun.
There is no abstract created for this record-
Document
Published: 01 Jan 1970
-
RB 70/00116 Groundwater survey, Ivy Tanks Motel - R.J. Martin.
There is no abstract created for this record-
Document
Published: 01 Jan 1970
-
RB 73/00144 Second progress report Eyre Highway groundwater survey, Penong to the Western Australian border.
This report summarizes results of drilling to obtain water supplies for construction of the Eyre Highway, to the beginning of June, 1973. Drilling problems in the limestone have been encountered. Production from open trenches has been moderately...-
Document
Published: 01 Jan 1973
-
RB 73/00243 Final report, Eyre Highway groundwater survey. Penong to the Western Australian border.
Drilling and pump testing of selected bores along the Eyre Highway between Penong and Eucla was completed in August, 1973. Water supplies have now been established all along the route. This report contains final results of the survey. Geology and...-
Document
Published: 01 Jan 1973
-
Trial Well. Progress and final reports to licence surrender for the period 15/6/79 to 4/1/82.
TARGET: An assessment of the potential for uranium and lignite deposits within the Eocene Pidinga Formation, and separate investigations of coincident, possible Olympic Dam target type magnetic and gravity anomalies in the crystalline Precambrian...-
Document