Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
Report on preliminary feasibility study of use and mining of coal from deposits in an area near Lake Phillipson, South Australia.
Exploration drilling by Utah Development Co. during 1973 and 1974 in the area covered by EL 125 has outlined at least 2,000 million tonnes of medium quality steaming coal, of a quality considered to be comparable to that for coal from ETSA's Leigh...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Data release - as updated : Pound Creek. Annual reports and final report to licence full surrender, for the period 1/12/2010 to 16/11/2017.
South Australia Ludi Mining Pty Ltd (“SALM”) acquired Exploration Licence 4619 in the vicinity of Coward Springs to explore it for large Mesoproterozoic copper/gold/uranium deposits analogous to Olympic Dam, which is located approximately 120 km to...-
Document
Published: 21 Nov 1917
-
RB 74/00212 Micropalaeontology of cores from Oodnadatta town bore no. 2.
Two cores from Oodnadatta Town Bore No. 2 were examined for microfossils. A fishing core at about 72m is of Late Albian to ?Conomanian age and is correlated with the Mount Alexander Sandstone Member of the Oodnadatta Formation in Santos Oodnadatta No....-
Document
Published: 01 Jan 1977
-
Wintinna Coalfield hydrogeological and geotechnical study.
This study has formulated a geotechnical and hydrogeological model of the Wintinna Coalfield which satisfies the following objectives: - to provide answers to the hydrogeological and geotechnical questions raised by Fluor in their mining study; - to...-
Document
Published: 05 Dec 1983
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress reports and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 1 of 2 ].
Diamond exploration undertaken within the southern of two adjoining licence areas taken up along part of the western flank of the Peake and Denison Ranges, that is centred ~100 km south-east of Oodnadatta, was aimed at discovering the source(s) of...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-01 - South Australia Ludi Mining Pty Ltd, Coward Springs area gravity/magnetic anomaly IOCG targets. Drilling project interim report and final report.
South Australia Ludi Mining Pty Ltd (“SALM”) acquired Exploration Licence 4619 “Coward Springs” to explore for large Mesoproterozoic copper/gold/uranium deposits analogous to Olympic Dam, which is located approximately 120 km to the south. The licence...-
Document
-
Robin Rise. First partial surrender report, for the period 2/1/1997 to 1/1/2001.
A regional drilling programme was undertaken to investigate the economic potential of possible Permian coal occurrences within buried extensions to the Lake Phillipson Trough, in its adjacent northern Penrhyn Trough and south-eastern Ingomar regions...-
Document
-
Mount Arthur. Progress reports and final report to licence expiry/full surrender, for the period 5/9/1980 to 5/3/1983.
Exploration for possible kimberlite pipes in the Mount Arthur - Mount Toodla area, 30 km east-southeast of Oodnadatta, has included preliminary gravity and ground magnetic surveys, stream sediment sampling, and the drilling of a single diamond cored...-
Document
Published: 09 Jun 1983
-
Preliminary mine planning and costing study, Wintinna Coal Deposit.
The 2000 Mt Wintinna coal deposit is located approximately 700 km north-northwest of Port Augusta in South Australia. The area has opencut potential, and is proposed for development to supply a thermal power station. Meekatharra Minerals Ltd holds...-
Document
-
Oodnadatta. Combined first progress / final report to licence surrender for the period 22/6/1972 to 28/1/1973.
Reconnaissance prospecting, plus close inspections and sampling of historically briefly worked auriferous areas in the basal Mesozoic sediments on the banks of the Neales River, suggest that any reserves and grades present there would be insufficient...-
Document
Published: 08 Nov 1972
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 2010
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-05 - Areva Resources Australia Pty Ltd, Denison Range Project, eastern flank Mesozoic sandstone-hosted uranium targets. Drilling project final report.
Areva's Denison Range Project is targeting possible economic sandstone-hosted uranium mineralisation that may have formed within the Mesozoic sandstones located to the east of exposed uranium-rich basement rock sequences of the Palaeo- to...-
Document
Published: 29 Aug 2013
-
Enungarenna Hill, Mount Treloar and Lambina (the Abminga East Project). Joint annual reports plus final reports to licences' respective surrender, for the period 22/10/2007 to 9/12/2011.
Exploration targeting possible economic sedimentary, roll front - style uranium mineralisation which might have formed in buried palaeochannels within the Mesozoic Eromanga Basin along its western margin, approximately 115 km north-east of Marla,...-
Document
Published: 06 Feb 2012
-
Francis Swamp and Margaret Creek (part of the Billa Kalina G2 Diamond Project). Data release made upon the full surrender of subsequent licences: annual reports and combined annual reports to licences' joint renewal, 13/10/2000 to 12/10/2005.
Exploration for possible commercial diamond deposits has been carried out along a portion of the G2 gravity lineament located immediately south of William Creek and the southern Peake and Denison Ranges, looking for inferred diamondiferous kimberlite...-
Document
Published: 06 Jun 2007