Morialpa. Data release made in lieu of submitting a first partial surrender report : progress reports and annual reports for the period 16/12/1995 to 8/8/2003.
Initial exploration for stratiform Cu-Au mineralisation hosted within Adelaidean sediments in the Morialpa area, 40 km north- west of Olary, comprised soil, stream sediment, rock chip and ironstone lag geochemical sampling, and 1:10,000 scale...-
Document
Published: 29 Aug 1903
-
Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.
An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...-
Document
-
RB 2018/00003 Summary and final report on pyrite, magnetite and hematite mineral geochemistry, South Australia (including samples from the Mineral Systems Drilling Program and the Emmie Bluff IOCG prospect).
Sulfide and oxide trace element geochemical analyses have been conducted on more than 290 core chip samples collected from stored drill cores of 39 drillholes located across South Australia, as part of a collaborative project being conducted between...-
Document
Published: 01 Feb 2018
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Cowell (latterly part of the Cowell JV Project). Annual reports for the period 23/9/2002 to 6/11/2008.
A large licence area, comprising two separate blocks aligned along strike, which cover the northern Cowell Hills and the less elevated country stretching north-east of Lucky Bay, was taken up by Avoca Resources Ltd as part of a much wider search...-
Document
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document