-
Murray Basin. Final report, Project ADI RD02-289 [Accelerated Discovery Initiative Round 2, 2022].
Hillgrove Resources Ltd (HGO) has identified a large number of geophysical targets through the south-east Cambro-Ordovician basement of South Australia prospective for Cu-Au mineralisation and covered by the Tertiary-Quaternary Murray Basin sediments....-
Document
Published: 12 Sep 1922
-
Mount Gunson copper deposit. Cattlegrid orebody sample testing by metallurgy and mineragraphy (results of 1973 and 1974 studies).
There is no abstract created for this record-
Document
-
Kalabity. Annual reports and final report to licence expiry/full surrender, for the period 18/11/2000 to 28/3/2014.
An area situated ~100 km west of Broken Hill has been explored for buried base and precious metals epigenetic mineralisation that might have formed within Palaeoproterozoic meta-igneous and metasedimentary basement rocks of the north-eastern Olary...-
Document
-
RB 22/00009 Mineral resources of South Australia and their utilization.
There is no abstract created for this record-
Document
Published: 27 May 1946
-
RB 2014/00002 Carbonate hosted Pb-Zn-Ag deposits. exploration using light hydrocarbons as pathfinders.
Surveys recently conducted in England, Ireland and Australia have shown that there are major spatial variations in the 'light' [molecular weight] hydrocarbon gas content of rocks which are closely related to the presence of underlying mineralisation....-
Document
Published: 01 Jul 1995
-
Design and costing study for a proposed zinc silicate ore direct leaching plant to be built at Risdon, Tasmania, to treat Beltana mine concentrates.
Report details engineering designs, drawings and costings for a new commercial scale leaching plant intended by E-Z to treat 70,000 tons/year of its crushed Beltana willemite ore having an average feed grade of about 40% Zn. The enriched, dissolved...-
Document
-
Beltana - Puttapa region. Progress reports and technical reports to licence expiry/renewal, for the period 3/8/1972 to 2/8/1974.
Geological mapping and the interpretation of drillhole data from the vicinity of the recently defined Southern orebody extension at Beltana (including 4 new diamond holes totalling 1600 feet) has enabled the licensee to formulate likely parameters of...-
Document
Published: 13 Feb 1975
-
Beltana Project Feasibility Study - Parts 2 to 5.
A mining and mineral processing feasibility study was commissioned by E-Z Corp. from industrial engineering consultant Davy-Ashmore in October 1971, and was completed in February 1972, to define all foreseeable technical aspects of the processes...-
Document