-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-47 - [prospecting for] water in Permian palaeochannels draining the Mount Woods Inlier. Project final report.
Development of the Prominent Hill copper-gold deposit in the Mount Woods region will require an adequate source of water to support planned mining and ore processing operations, currently estimated to involve at least 6 million tonnes of ore per year....-
Document
Published: 10 Jun 2005
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Callabonna / Petermorra (part of the Lake Elder Project). Annual reports for the period 19/3/1998 to 30/4/2015.
Exploration Licence 2494 was granted in March 1998 to Paladin Energy Minerals NL and Brightstar Power Corporation Pty Ltd - the Paladin Brightstar Joint Venture (PBJV), with Paladin Resources NL as manager. The target commodity being explored for by...-
Document
Published: 20 May 2015
-
Callabonna [Creek] (part of the Curnamona North Project). Annual and final reports to licence surrender, for the period 30/9/2009 to 23/8/2011 : no work performed.
Exploration for possible economic sandstone-hosted Tertiary palaeochannel uranium deposits within two small licence subareas located near Callabonna Creek immediately north-east of Lake Callabonna has consisted only of indirect participation in a...-
Document
Published: 01 Jun 2011
-
Quinyambie (part of the Curnamona North Project). Final report at licence expiry/full surrender, for the period 17/7/2007 to 16/7/2011.
As part of regional exploration for possible economic sandstone-hosted Tertiary palaeochannel uranium deposits within a project area extending eastwards from Lake Callabonna to the SA-NSW State border, licensee Frome Uranium has relied on airborne EM...-
Document
Published: 20 Dec 2012
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Frome North. Annual reports for the period 19/8/2013 to 18/8/2016.
An area in the south-west of the Frome Embayment, that is centred ~80 km south-southeast of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium...-
Document
Published: 08 Sep 2016
-
Lake Yannerpi (part of the Curnamona North Project). First partial surrender report at licence expiry/renewal, for the period 16/7/2007 to 15/7/2011.
As part of regional exploration for possible economic sandstone-hosted Tertiary palaeochannel uranium deposits within a project area extending eastwards from Lake Callabonna to the SA-NSW State border, licensee Frome Uranium has relied on airborne EM...-
Document
Published: 20 Dec 2012
-
Lake Frome Project. Individual licence annual reports, joint annual reports and final reports to various constituent licences' joint full surrenders, for the period 16/4/2009 to 5/6/2015.
An area centred ~36 km west of Quinyambie Homestead has been explored for possible buried economic sedimentary uranium mineralisation of palaeochannel hosted roll-front style that may have formed in relatively more distal Tertiary basinal sediments,...-
Document
Published: 30 Mar 2015
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 2006
-
Mabel Creek. Annual and final progress reports to licence expiry/full surrender for the period 3/12/1999 to 2/12/2003.
As part of an exploration project targeting possible large-scale opal occurrences hidden at depth beneath marine shale outcrops in the Stuart Range 'Breakaway' country, the subject licence was taken up to cover certain ground lying adjacent to the...-
Document
Published: 25 Jun 2003
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 2007
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 2010
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 2015