-
Yarley. Annual reports to licence expiry/full surrender, for the period 19/8/2009 to 18/8/2012.
A small area located on the southern Lake Torrens Plains immediately west of the ABC Range was taken up to allow evaluation of its potential for having buried economic sedimentary coal and/or uranium mineralisation occurrences. There are no...-
Document
Published: 02 Sep 2012
-
Data release - as updated [made at SA Director of Mines’ discretion] : Arkaroola. Annual reports for the period 5/12/2008 to 3/12/2015.
During the 2008-2009 licence year, most of the new work done consisted of appraisal rotary mud drilling at Four Mile East (112 holes for 24,460 m) and Four Mile West (113 holes for 19,120 m), with the addition of one NQ diamond cored hole (AKC093) for...-
Document
Published: 20 Jan 2016
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 2015
-
Bond Hill. Annual reports to licence surrender for the period 17/5/2002 to 3/6/2005.
An area located between Lakes Acraman and Gairdner was taken up to explore for possible buried iron oxide - associated copper-gold deposits hosted by subcropping basement rocks of the Gawler Range Volcanics (GRV). The licensee had noted a lack of...-
Document
Published: 14 Apr 2005
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 2016
-
Data release made in lieu of submitting a final report at the expiry/full surrender on 4/11/2019 of EL 5212/6172 Alford (the last-held licence of the Alford Joint Venture Project) : Project joint annual reports for the period 1/7/2014 to 30/6/2016.
A group of four separate tenements located on northern Yorke Peninsula to the north-east and south-west of the historic Cu-Au producing Moonta-Wallaroo region has been explored for possible economic buried IOCG style mineralisation that may have...-
Document
Published: 01 Sep 2016
-
Novel technologies for [use in] mining and [earth resource] exploration: remote smart sensor deployment for in situ geophysical analysis. Final report, Project ADI RD01-123 [part of Accelerated Discovery Initiative Round 1, 2022].
Nine compact seismic motion recorders and nine co-located ground probe thermocouples have been deployed at various sites near the Carrapateena mine, to test the efficacy of making continuous remote data collection and the reliability of their...-
Document
Published: 27 Oct 2022
-
A new approach to mapping basin architecture using airborne magnetotelluric survey data - the Copper Coast Project trial. Final report, Project ADI RD02-306 [part of Accelerated Discovery Initiative Round 2, 2022].
IGO Ltd’s (IGO) Copper Coast Project is located along the eastern margin of the Gawler Craton in South Australia, and covers Proterozoic rocks of the Stuart Shelf, Torrens Hinge Zone and Adelaide Rift Complex, which form part of the Adelaide...-
Document
Published: 21 Mar 2022
-
Honeymoon Uranium Project. Final report for approved seismic geophysical work programme, Project ADI RD01-100 [part of Accelerated Discovery Initiative Round 1, 2021].
Within two areas located north-west of Cockburn, Honeymoon Project licensee Boss Energy (Boss) is targeting possible sandstone-hosted uranium mineralisation in primarily palaeochannel-hosted, redox-controlled type occurrences, similar to the...-
Document
Published: 30 Nov 2021
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 9/8/2010 to 8/8/2015.
During licence Year 16, on its renewed EL 4534 over the period October to December 2010, South Australian Coal Limited (SA Coal) undertook a drilling campaign of 15 rotary mud partly cored vertical holes for 2871 m which included 2064.7 m of coring,...-
Document
Published: 01 Sep 2016
-
Interpreted [solid] geology of the eastern Coompana Province, 1:500 000 scale.
There is no abstract created for this record-
Map
Published: 01 Nov 2018