-
ExpNotes WOODROFFE: Explanatory Notes WOODROFFE
There is no abstract created for this record-
Document
-
ExpNotes NOOLYEANA: Explanatory Notes NOOLYEANA
There is no abstract created for this record-
Document
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
ExpNotes KINGOONYA: Explanatory Notes KINGOONYA
There is no abstract created for this record-
Document
-
EL 6437 Annual Technical Report to period ending 24/11/2020
The Torrens joint venture project covers 818 km2 along the eastern limit of the Gawler Craton in a similar structural setting as the nearby Olympic Dam and Carrapateena deposits. This report outlines exploration undertaken during the period 25/11/2019...-
Document
Published: 24 Feb 2021
- ZIP,
-
Western Gawler: Gawler Phase 2 data packages
The Gawler Phase 2 (GP2) Data Packages is a catalogue of data collected or compiled by GSSA as part of the Gawler Phase 2 project. The datapackages include geophysical surveys (gravity, magnetotellurics, and airborne electromagnetics); geochemistry;...-
Dataset
- ZIP
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-63 - Gawler Iron Project, Mount Christie district - Archaean BIF hosted stratabound iron ore prospects. Drilling project final report.
The Gawler Iron Project is situated approximately 25 km north of the Trans-Australian Railway and 200 km south-west of Coober Pedy, along the western margin of the Gawler Craton in South Australia. The project area formerly had not been systematically...-
Document
Published: 30 Jan 1912
-
EL 6458 6783 Joint Annual Technical Report to period ending 08/11/2024
This report represents the Final Technical Report for EL 6458 and EL 6783. Originally Tri-Star was targeting coal resources within the Anderson Range Project. This focus shifted in 2021 to uranium conducive to insitu leaching, as well as metalliferous...-
Document
Published: 22 Nov 2024
-
Joint Annual Technical Report to period ending 31/03/2024 - Strzelecki Project
The Strzelecki Project comprises eleven semi-contiguous Exploration Licences of 8,827 km2, located over the Frome Area – Curnamona Province on the eastern border of South Australia. This combined Annual Group Report is for work completed in the year...-
Document
Published: 07 Nov 2024
- PDF,
- DOCX
-
EL 6743 6744 Joint Partial Surrender Report to period ending 7/11/2025
Exploration Licences 6743 and 6744 form a part of the AEA051-001 Central Australia Minerals Project, which comprises 4 contiguous licences that are located over the eastern Musgraves Province - Pedirka/Warburton Basin on the South Australia - Northern...-
Document
Published: 09 Jan 2025