Peake and Malinong. Final report at licences' joint full surrender, for the period 7/7/1980 to 6/8/1982.
In a search for economic Tertiary brown coal in the south-eastern Murray Basin, a large reconnaissance drilling programme was undertaken during February-April 1981 to test known carbonaceous sediments reported as encountered by previous drillholes and...-
Document
Published: 06 Sep 1982
-
Petroleum geochemistry of the Otway Basin, and the significance of coastal bitumen strandings on adjacent southern Australian beaches. Volumes 1 to 5 source rock studies.
The standing of crude oil on the beaches of southern Australia was first recorded approximately 150 years ago. This material, known locally as coastal bitumen, was used by the early maritime visitors and settlers to caulk their vessels and is the...-
Document
-
RB 37/00028 Leigh Creek Coalfield: Report on exploration of the north-eastern margin - Telford Basin area 'Telford Opencut, extension east'. (CONFIDENTIAL)
An area located on the north-eastern margin of the Telford Basin, to the east of the present extent of theTelford Open Cut mine main pit, which is known to contain potentially mineable buried coal seams, has been examined geologically and...-
Document
Published: 03 Mar 1954
-
RB 94/00044 Soil air carbon dioxide and oxygen as a guide to oxidising sulphide concealed beneath shallow cover. Soil air CO2/O2 project: review report 1.
A joint project between Dr I.G. Watmuff (consultant) and the Department of Mines and Energy, South Australia, to appraise the soil air CO2/O2 technique as a guide to concealed oxidising sulphides, has been completed. Testing was conducted over known...-
Document
Published: 01 Oct 1994
-
RB 95/00029 Leigh Creek Coalfield, Lobe E coal deposit. Geological report.
In 1993 an exploration drilling program was undertaken jointly by The Department of Mines and Energy (MESA) and ETSA Corporation (ETSA) over areas considered prospective for coal within the vicinity of the existing infrastructure of the Leigh Creek...-
Document
Published: 01 Jun 1996
-
RB 96/00025 Exploration for coal in the Coober Pedy area, South Australia.
As part of the Government's South Australian Exploration Initiative (SAEI), and in support of the South Australian Steel and Energy (SASE) Project, a small coal exploration program was initiated by MESA to investigate a number of subtle magnetic lows...-
Document
Published: 01 Sep 1996
-
NERDDC Project 590 : [ Research into the feasibility of ] Underground gasification of [ mining inaccessible ] Leigh Creek coal. Reports on field investigations and geotechnical studies.
During the first few months of 1985, field investigations were undertaken at Leigh Creek by consultants Golder Associates to provide quantitative data on the strength and permeability characteristics of the geological profile of the Main Series coal...-
Document
-
Results of limited quality testing on Lake Phillipson coal.
Analyst's reports presenting the results of small scale test work conducted on selected drill core samples of coal taken from the 'S' and 'T' seams in the West Basin deposit of the Lake Phillipson coal measures.-
Document
-
Rehabilitation of the Nairne Pyrites Ltd quarry area and treatment of acidic effluent. Progress and final reports on investigations for the period March 1973 to June 1975.
A chemical survey of Dawesley Creek in the Brukunga Mine area has concluded that seepages from the southern mine waste dumps located alongside the creek contribute the greater proportion of pollutants (acidity, iron, aluminium, manganese, zinc,...-
Document
-
Arckaringa [North-east]. Annual reports to licence full surrender, for the period 13/4/2005 to 3/6/2014.
An area of 185 square km was taken up by SAPEX to allow it to evaluate afresh known sub-bituminous coal measures in the Permian Mount Toondina Formation that constitute the East Wintinna coal deposit. This deposit had been discovered by Meekatharra...-
Document
Published: 11 Jul 1914
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-14 - Mingary Station, Broken Hill Domain, Palaeoproterozoic lode style stratabound hydrothermal Au-Cu-Ag prospects. Drilling interim and final reports.
During 2014, Minotaur Exploration successfully applied for a PACE 2015 collaborative drilling subsidy grant to help it undertake drill testing of the inferred extension within its current tenement EL 4844 Mingary of the quartzite lode horizon present...-
Document
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
Port Wakefield. Progress reports to licence expiry/renewal for the period 2/3/1977 to 1/3/1978.
TARGET: Definition of economic brown coal mineralisation in the northern Saint Vincent Basin. EXPLORATION: Open-hole rotary drilling of 127 holes totalling 11,103 m, including a reported minimum of 468 m of HQ rotary coring in 24 of the holes. The...-
Document
-
Lochiel deposit run-of-mine coal quality - Procedures for calculation.
The report summarises the methods used to derive run-of-mine coal quality, and presents models. The quality models were generated over the measured portion of the deposit and relate to the cumulative coal zone. The data used includes all data from...-
Document
-
Northern Saint Vincent Basin, Port Wakefield and Lake Bumbunga areas. Coal deposit appraisal reports, plus pre-mining economic feasibility studies, for the period 4/10/78 to 28/7/90.
TARGET: Coal in the northern Saint Vincent Basin. EXPLORATION: Rotary open hole and core drilling of over 700 holes, including large diameter core and bulk sampling at the Lochiel and Bowmans trial pits. RESULTS: The Lochiel and Bowmans coal resources...-
Document
Published: 01 Jan 1991
-
Lochiel coal deposit geological report.
In 1982 ETSA carried out an exploration programme which lead to the discovery of the Lochiel brown coal deposit. Over 10,000 metres of drilling have been completed within the deposit. Reserve and resource calculation and hydrogeological and...-
Document
-
Tilparee A1. Test reports.
There is no abstract created for this record-
Document
Published: 01 Jan 1993
-
Big Lake 22. Test reports.
There is no abstract created for this record-
Document
-
Fly Lake 1. Test reports.
There is no abstract created for this record-
Document
-
Munkarie 4. Test reports.
There is no abstract created for this record-
Document