South Puttapa. Progress and final summary reports for the period 15/7/1970 to 16/7/1971.
Appraisal of the Beltana zinc deposit continued during the current licence period, principally by diamond drilling (6 holes, total 2570 feet) aimed at delineating blind extensions to the main orebody on its southern side. The drilling was very...-
Document
-
Lake Torrens Areas 1 and 2, Lake Torrens South and Lake Torrens North (the Lake Torrens Brine Potash Project). First joint annual report plus final report to licences' joint full surrender, for the period 5/1/2015 to 16/6/2016.
Much of the eastern side of the very large, 5,745 square km saline playa Lake Torrens, which occupies one of the most arid parts of Australia, was taken under licence by a Northern Territory - based company with the intent of systematically sampling...-
Document
Published: 14 Jun 1916
-
RB 2000/00010 Investigation of the potential for rainwater harvesting at Nepabunna, North Flinders Ranges, South Australia.
The availability of rainwater, and possible harvesting techniques and storage media are investigated. Reasonable amounts of rainfall occur, but falls are interspersed by long droughts. There are problems with silting up of dams, and with protecting...-
Document
Published: 01 Apr 2000
-
Diapir-base metal association in the northern Flinders Ranges.
A number of base metal occurrences in the northern Flinders Ranges, previously classified as syngenetic, diagenetic and epigenetic in nature, appear to have resulted from metalliferous brine-sediment interaction with autochthonous and allochthonous...-
Document