-
RB 76/00008 Monarto new town. Proposed city centre. Geotechnical investigations report no. 2.
Engineering geological investigations consisting of cable tool drilling of 10 holes up to 15.25m deep, penetration testing and seismic refraction surveys were completed at the proposed CBD of the Monarto city centre. Drilling encountered thin...-
Document
Published: 02 Feb 1976
-
RB 76/00107 Stratigraphy and engineering geology of the Monarto designated area - Monarto Development Commission.
Drilling of 25 cable tool holes to depth up to 20.1m in the designated area for Monarto New Town illustrates the nature, distribution and thickness of Quaternay and Tertiary sediments. The main tertiary units are the marine fossiliferous limestone of...-
Document
Published: 01 Jan 1976