Ashville gypsum deposits. Retention lease six-monthly combined reports for the period 14/9/1993 to 1/6/1996.
Activity on these deposits has consisted of one phase of trial mining of 600 cubic m of the best quality part of the Warnes deposit, stockpiling of the extracted gypsum-rich lakebed sediments, chemical analysis of 39 bulked samples of this stockpile...-
Document
-
Point Paterson - Port Pirie area. Progress reports on work carried out prior to grant of a special mining lease, for the period June 1962 to November 1969.
The applicant proposes during the two year SML period to undertake a work and study programme to determine the economic feasibility of developing a seawater salt recovery complex on the areas applied for, which will be capable upon completion of the...-
Document
Published: 07 Nov 1969
-
Lake Torrens. Progress reports to licence expiry/renewal for the period 13/4/1973 to 12/4/1975.
Continuing exploration by Delhi of the industrial salt potential of subsurface brines in the Lake Torrens basin aimed to ascertain the potential reserves of NaCl in the southern part of the lake, and to confirm the availability of suitable brine...-
Document
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
False Bay. Progress reports to licence expiry/renewal, for the period 1/7/1969 to 30/6/1971.
Site investigations of the coastal area abutting False Bay, immediately north of Whyalla, were undertaken by BHP's Industrial Minerals Div. to gauge the feasibility of expanding their Whyalla Salt Works from its existing 60,000 tons per annum...-
Document
Published: 07 May 1970
-
Peesey Swamp, southern Yorke Peninsula. Progress reports for the period 1/5/1969 to 31/10/1970.
The enclosed reports describe geological, hydrological, geotechnical, market research, and plant design and trial construction work that has been carried out with a view to determining the feasibility of an integrated groundwater and seawater salt...-
Document
-
Salt damp research progress reports 1 to 10.
There is no abstract created for this record-
Document
Published: 01 Jan 1978
-
Interim report on the completion of phase I of the Peesey Salt Project.
There is no abstract created for this record-
Document
Published: 01 Jan 1969