-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-17, Mount Moulden and Mount Harcus mineral prospects. Project final report.
As part of the PACE Year 2 collaboration between PIRSA and the minerals industry, PepinNini Minerals proposed and was granted part subsidy funding for an extensive drilling programme in the western APY Aboriginal Lands of South Australia, to examine...-
Document
Published: 16 Jun 1906
-
Hanging Knoll. Annual reports to licence expiry/full surrender, for the period 20/10/1995 to 6/9/2003.
Mafic and ultramafic rocks of the Proterozoic Giles Complex, which have intruded highly metamorphosed basement units of the Musgrave Block in an area 300 km WNW of Marla, were considered to have potential to host massive Ni sulphide mineralisation,...-
Document
Published: 02 Apr 1903
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles / Wingellina Nickel Project). Annual reports for the period 24/9/2009 to 23/9/2018.
Field work performed on the subject tenement during licence Year 8 included the conduct of Aboriginal heritage clearance surveys by the APY Traditional Owners to grant access for geological mapping and the acquisition of a trial seismic survey, as...-
Document
Published: 23 Nov 1918
-
Data release [made at SA Director of Mines' discretion] : Hanging Knoll (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the south-eastern end of the Mann Ranges in South Australia's Far North-west Aboriginal Lands, approximately 90 km south-southwest of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as...-
Document
Published: 12 Apr 1907
-
Data release [made at SA Director of Mines’ discretion] due to licence expiry and pending approval of its subsequent re-grant : Pine Ridge (part of the Central Giles Nickel Project). Annual reports for the period 25/2/1999 to 29/3/2007.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored by Rio Tinto Exploration (RTE) as part of work planned for a larger set of project exploration licences currently...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Hardy (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the eastern end of the Deering Hills in South Australia's Far North-west Aboriginal Lands, approximately 150 km south-west of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as part of...-
Document
Published: 12 Apr 1907
-
North Deering Hills (Yalukula and Palatu). Annual reports to licence full surrender, for the period 20/10/1995 to 6/9/2003.
Mafic and ultramafic rocks of the Proterozoic Giles Complex, which have intruded highly metamorphosed basement units of the Musgrave Block in an area 380 km WNW of Marla, were considered to have potential to host massive Ni sulphide mineralisation,...-
Document
-
Mount Irwin and Mount Howe. Annual reports to licence surrender for the period 8/1/1996 to 31/10/2003.
Mafic and ultramafic rocks of the Giles Complex, which intrude highly metamorphosed units of the Musgrave Block in an area 130 km north-west of Marla, were considered to have high potential to host base metal and precious metal mineralisation....-
Document
Published: 31 Oct 1903
-
Mount Howe. Annual and final reports for the period 26/9/1994 to 25/9/1998.
An aeromagnetic/radiometric survey and an aircore drilling program (41 holes, total 247 metres) were carried out near the SA/NT border to the north, north-east and west of De Rose Hill, to test three positive aeromagnetic features which potentially...-
Document
-
Mount Irwin. Partial surrender report for the period 8/1/1996 to 7/1/2001.
Interpretation of airborne geophysical data from an area 130 km north-west of Marla identified several magnetically anomalous zones. No follow-up was considered warranted.-
Document
Published: 19 Jun 1901
-
Sundown [Outstation]. Annual and final reports to licence expiry/full surrender for the period 25/6/2002 to 24/6/2006.
An area located approximately 100 km north-west of Marla was targeted for possible Ni/Cu/PGE magmatic massive sulphide mineralisation contained within buried outliers of the Giles Complex mafic intrusive complex, perhaps present in a setting similar...-
Document
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017