-
Amdel service work report on uranium-lead [radiometric] dating of an outcrop sample [of the Boucaut Volcanics].
An absolute age of 677 Ma +/- 12 Ma was determined from analyses of six selected zircon grains separated from the subject volcanic rock sample, but the result is strongly affected by the need to impose large corrections to the data to compensate for...-
Document
Published: 06 Oct 1988
-
Geochronology service reports prepared by Amdel Ltd and another laboratory, for the period 6/10/1989 to 14/12/1990.
There is no abstract created for this record-
Document
-
RB 55/00006;Amdel 00126 Accessory minerals of South Australian granites.
The purpose of the work described was to compare and contrast the petrography, accessory minerals, and absolute ages of 25 granitic and allied rock samples collected from widely scattered localities in South Australia. The processes that are...-
Document
Published: 01 Aug 1961
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Elliston. Combined fourth annual and final report to licence expiry/full surrender, for the period 26/4/2002 to 25/4/2006.
An area situated immediately south-east of Elliston has been explored for diamonds, in conjunction with similar work being carried out by the joint venture on Flinders Island and on its adjoining Venus Bay, Colton and Polda mineral exploration...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
Geochronological synthesis of southern Australia - Part 1 The Curnamona Province, and Part 2 The Gawler Craton (SADME Data Package.).
The review reports in this data package present a synthesis of geochronological information for southern Australia, i.e. South Australia and geologically associated areas in New South Wales and Victoria. The data given represent the outcomes of much...-
Document
Published: 19 Sep 1997
-
Data release - as updated [made at SA Director of Mines' discretion] : Prospect Hill. Annual reports for the period 25/7/2006 to 24/7/2018.
Continued evaluation of possible economic primary tin oxide mineralisation at three known separate occurrences in the Prospect Hill area, lying 20 km north-west of Moolawatana Homestead, has focussed on the untested zone immediately below the known...-
Document
-
Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.
An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
Uno Station. Progress reports and final report to licence expiry/renewal, for the period 10/9/1970 to 9/9/1971.
The discovery in July 1970 of a strong surface radioactive thorium anomaly emanating from outcrop near Uno Homestead, 48 km north-west of Iron Knob, which was made by a Japanese company's geophysical prospecting party, prompted the leasing of the...-
Document
Published: 10 Sep 1971
-
RB 2021/00015 LA-ICP-MS detrital zircon geochronology from the Delamerian Orogen.
A geochronological study of clastic metasedimentary units buried in the Delamerian Orogen region of South Australia has been undertaken to gain a better understanding of the age and provenance of these units and to assess their similarities to...-
Document
Published: 01 Nov 2021
-
RB 2020/00015 Reconnaissance zircon U-Pb geochronology of the southeastern Olympic Cu-Au Province, South Australia.
The eastern Gawler Craton is the location of the Olympic Cu-Au Province, a world-class metallogenic province known for iron oxide - associated copper-gold (IOCG) deposits such as Olympic Dam, Prominent Hill and Carrapateena (Skirrow et al., 2007;...-
Document
Published: 01 Aug 2020
-
RB 2022/00003 Zircon provenance and sedimentary transport processes – implications for the late Neogene evolution and heavy mineral deposits of the western Murray Basin, South Australia.
Strandlines or elevated shorelines, located across the Murray Basin in south-eastern Australia, trace the preserved remnants of former emergent coastlines that developed during the Late Miocene (c. 7 to 4 Ma) marine regression. Strandline traces...-
Document
Published: 01 May 2022
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
RB 2006/00021 Tectonics of the southeastern Gawler Craton, South Australia: A field guide to the Palaeoproterozoic gneisses of Corny Point, Yorke Peninsula
This field guide presents an introduction to the geology and tectonics of the south-eastern Gawler Craton, particularly as observed at the Corny Point locality. Topics covered include the detrital zircon age distributions within the Corny Point...-
Document
Published: 01 Dec 2006
-
RB 2019/00018 U-Pb geochronological data from the Fowler Domain, western Gawler Craton.
This report presents newly acquired Sensitive High Resolution Ion Microprobe (SHRIMP) U-Pb geochronological data produced by analysis of zircon crystals separated from six samples of rocks from the Fowler Domain, western Gawler Craton, that were...-
Document
Published: 01 Sep 2019
-
RB 2006/00004 Crustal evolution of the Gawler Craton, South Australia: Application of the TerraneChron technique to detrital zircon from modern stream sediments.
This report presents the results of a Terranechron [registered brand name for this proprietary technique] study of detrital zircons from modern stream sediments of the Gawler Craton. The Terranechron approach involves obtaining uranium - lead decay...-
Document
Published: 01 Feb 2006