-
RB 36/00082 Wagon drilling programme, Katunga Hills, Middleback Range. Progress report.
Report presents results of reconnaissance wagon [rotary percussion] drilling of 24 vertical iron ore exploration boreholes carried out along four drill traverses laid out on the upland portions of the Katunga Hills, during a campaign progressed during...-
Document
Published: 04 Nov 1953
-
RB 37/00149 Appraisal of Torrens barite mine, Hundred of Onkaparinga.
In February 1951, South Australian Barytes Limited became interested in this mine, held under claim by Reginald John Alfred Larsson and requested an inspection by Department of Mines officers. This request was repeated, and endorsed by Larsson in...-
Document
Published: 17 Jun 1954
-
RB 54/00073 Summary report on the investigation of the Warramboo aeromagnetic anomaly, central Eyre Peninsula.
As part of the SADM iron exploration programme in South Australia, geophysical and drilling investigations have been undertaken on the Warramboo Anomaly, the largest elongate asymmetrical aeromagnetic anomaly in the State outside of the Middleback...-
Document
Published: 15 Mar 1962
-
RB 99/00028 Sand resources of the Mount Compass area. Reconnaissance drilling and testing.
Mount Compass is an important sand resource area. The ACI Glenshera sand pit, which supplies Australia's largest container glass plant at West Croydon with over 100 000 tonnes per year of glass sand, is also a major source of foundry sand. Four...-
Document
Published: 01 Oct 1999
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
Mount Grainger (Oodla Wirra). Progress reports and final report to licence expiry/full surrender, for the period 8/10/1970 to 7/10/1971.
Extensive literature and geological and geochemical field investigations of historic mines and prospects at the Mount Grainger and Oodla Wirra Goldfields have failed to disclose any remaining economic gold occurrences. The sparse native gold occurs...-
Document
Published: 12 Oct 1971
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ooldea. Annual reports for the period 1/9/2010 to 19/9/2018.
Due to catastrophic flood damage to Cosmo’s financial investments, no field work was undertaken during the twenty-first year of tenure under renewed EL 4565. In December 2010, Cosmo submitted to PIRSA a Declaration of Environmental Factors for its...-
Document
-
Weekeroo. Progress reports to licence expiry/full surrender, for the period 1/10/1970 to 30/9/1971.
A detailed examination of mineralised rock sequences within the metamorphosed Precambrian basement and Adelaidean cover rocks of the Weekeroo area, and recording of their relationship to successive deformational events and resulting rock structures,...-
Document
Published: 01 Sep 1971
-
Data release [made at SA Director of Mines’ discretion] : Iron Peak. Annual reports and final report to licence expiry/renewal, for the period 12/11/2003 to 11/11/2008.
The banded iron formations associated with various Neoproterozoic tillites in South Australia have for some time been recognised as being potential sources for iron ore, however, the low grade nature of the iron mineralisation within these bands has...-
Document
Published: 01 Jan 2009
-
Mine development at Iron Duke - Iron Duchess. Environmental impact and land use planning reports.
There is no abstract created for this record-
Document
Published: 01 Jan 1984
-
Otway Basin, South Australia. Structural interpretation of aeromagnetic and seismic data. Final report.
This report describes in great detail the background, process and conclusions of a study commissioned by the PEL 60 licensees to test the usefulness of aeromagnetic data to interpreting basin structural fabric and history, particularly for assisting...-
Document
-
Kimba Gap [South] (part of the Middleback Range Iron Ore Joint Venture Project). Annual reports [to the commencement of the Northern Eyre Peninsula Project licences' combined reporting status] for the period 17/9/2003 to 16/9/2006.
A small exploration licence area centred approximately 50 km west-northwest of Whyalla, which is mainly covered by Quaternary sediments, has been taken up by the South Australian Iron Ore Group (SAIOG) to explore for possible concealed economic...-
Document
-
Yarna Hill. Annual reports to licence expiry/full surrender for the period 19/11/2002 to 4/12/2010.
An area of sparse basement outcrop situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data...-
Document
-
Palthrubie Hill. Annual reports to licence expiry/full surrender for the period 21/5/2002 to 4/12/2010.
An area situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data which indicated that a number...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Pondooma. Annual and combined annual reports for the period 3/12/2002 to 2/12/2005.
Exploration Licence 3048 Pondooma, consisting of two separate sub-blocks that are centred ~60 km south-west of Whyalla, is located immediately west of the Middleback Range and 5 km west of Onesteel’s Iron Duke mine. This licence was granted to SA...-
Document
-
Data release [made at SA Director of Mines’ discretion] : [Coastal Magnetite Project] Iron ore prospects, eastern Eyre Peninsula. Project operator's report re. the prospects' 2002-2003 evaluation programme.
The key advantages of location and simple metallurgy of coastal Eyre Peninsula magnetite ores presented Portman Mining Ltd with an opportunity to enter a major under-explored and under-developed iron ore province and develop a new export business....-
Document
-
Data release [made at SA Director of Mines' discretion] : Bremer. Progress reports and annual reports to licence expiry/renewal, for the period 8/3/1991 to 7/3/1995. [ Index Part 1 of 3 ].
Exploration of an extensive area lying to the north of and surrounding Strathalbyn, 40 km south-east of Adelaide, is targeting possible economic stratiform base and precious metals mineralisation hosted within the Cambrian Kanmantoo Group...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
RB 22/00009 Mineral resources of South Australia and their utilization.
There is no abstract created for this record-
Document
Published: 27 May 1946
-
Warrakimbo. Progress reports and annual reports to licence surrender, for the period 31/10/1995 to 30/1/1999.
Mapping in the vicinity of the Warrakimbo mine and Rainy Day prospect, approximately 30 km west of Hawker, has indicated that altered dolomitic members of the Etina Formation are the most prospective hosts for specular haematite mineralisation, which...-
Document
Published: 30 Jan 1999