-
RB 79/00121 Uranno microgranite deposit for road sealing aggregate and rail ballast.
A quarry plan, designed to yield 100,000 cubic m of in-situ material, has been outlined in a microgranite outcrop on Eyre Peninsula which is located 15 km east of Cummins and 10 km south-east of the Uranno railway siding. Diamond drilling (3 inclined...-
Document
Published: 01 Oct 1979
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Coober Pedy south-east - Mount Brady Mafic Intrusive Complex exploratory drilling programme. Final report, Project ADI RD02-293 [part of Accelerated Discovery Initiative Round 2, 2022].
In an area centred ~40 km south-east of Coober Pedy, following its processing of open file GCAS aeromagnetic data (Region 8A/8B) using Vector Residual Mag Intensity (VRMI) and high frequency residual gradients, the licensee had identified two untested...-
Document
Published: 30 Jun 1922
-
Mineralization, geology, and structure, SML 118, Olary Province, South Australia.
A geological consultant's study of the Glenorchy - Plumbago granitic fault block area in the western half of SML 118, to try to elucidate its relationship to known uranium mineralisation, suggests that there is a structural association of lodes with...-
Document
Published: 23 Feb 1968
-
RB 66/00138 Satellite tracking station, Ceduna. Geological investigations progress report no. 1. Feasibility/design stage, Out of Hundreds, Co. Way.
An investigation of foundation conditions for a proposed Satellite Tracking Station about 19 miles northeast of Ceduna was carried out. Investigations at the site have included an inspection of the area with officers of the Overseas Telecommunications...-
Document
Published: 01 Jan 1968
-
RB 75/00133 Tarcoola-Alice Springs railway. Geological investigations at bridge sites, Marla Bore, SA, to Baystone Bore, NT.
Investigations to determine safe bearing capacities and recommended rounding depths for 10 bridge sites between Marla Bore, South Australia, and Baystone Bore, Northern Territory, have been carried out. Bearing capacities, in most cases presumed,...-
Document
Published: 01 Jan 1975
-
Data release [made at SA Director of Mines' discretion] : Mosely Nobs (part of the East Eyre Peninsula Project). Annual reports for the period 5/7/2006 to 4/7/2016.
A licence area now consisting of two separate small blocks located about 60 km west of Whyalla was taken up, along with other ground in the region, because it is thought to have potential for the discovery of uranium associated with Olympic Dam style...-
Document
-
Amdel Ltd project - Fluid inclusion studies of South Australian ores, rocks and minerals. Progress reports nos 1 to 6 for the period 7/5/1976 to 3/4/1980.
In September 1975 the South Australian Department of Mines accepted a proposal from Amdel Ltd to purchase and set up some microthermometry apparatus, in order to commence fluid inclusion studies of selected rock types and minerals in South Australia....-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-19, Honeymoon area base metal and hard rock uranium mineral prospects. Project final report.
EL 2937 licensee Southern Cross Resources has utilised PACE Initiative Year 2 funding assistance to carry out a collaborative drilling project to test 2 primary base metal/uranium targets within Willyama Group basement at a location 5 km south-east of...-
Document