-
Hanns Hill. Progress reports for the period 19/1/81 to 6/12/82.
Follow up to stream sediment sampling near Oodnadatta in the Mount Dutton area suggests that anomalous nickel, chromium and cobalt values are associated with ironstone, and anomalous niobium with geodes. No kimberlites were discovered.-
Document
Published: 01 Jan 1982
-
Pualco West. Progress reports and final report to licence expiry/full surrender, for the period 26/10/1972 to 25/10/1973.
Reconnaissance and detailed bulk loam sampling undertaken to look for diamonds or kimberlite indicator minerals in the vicinity of the Pualco Anticline, plus spectrographic analyses of the derived heavy mineral concentrates for gold and base metals...-
Document
Published: 12 Dec 1973
-
RB 77/00058 Geochemical appraisal of the Bunyeroo Formation, COPLEY 1:250 000 sheet.
There is no abstract created for this record-
Document
Published: 01 Jan 1979
-
Review of Mineral exploration activity, 2003 and 2004.
2003 activity: Expenditure by companies on mineral exploration licences in South Australia for calendar year 2003 was $37.0 million, a slight increase on the $35.7 million spent in 2002. Mineral exploration drilling metreage, a key indicator of...-
Document
-
Cooper Hill. Annual reports and final report to licence expiry/full surrender, for the period 4/7/2003 to 24/8/2009.
An area located approximately 90 km west-northwest of Ceduna, which was considered prospective for economic buried nickel, copper and cobalt mineralisation in Voisey's Bay type deposits that could possibly have formed in Proterozoic basement...-
Document
Published: 23 Oct 1909
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Calca and Poochera (the Streaky Bay Project). Data release made in lieu of submitting a first partial relinquishment report : joint annual reports for the period 22/10/2001 to 13/2/2005.
A multipart licence project area located approximately 100-150 km south-east of Ceduna is being targeted for possible Voiseys Bay type nickel, copper, cobalt and platinum group metal deposits within mafic to ultramafic basement rocks buried beneath...-
Document
-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-04, Ceduna Mafic Intrusive Complex base metal sulphide mineral prospects. Project interim and final reports.
Mithril Resources have used a grant of PACE Initiative Year 2 funds to perform additional drilling on their EL 3105 located just north of Fowlers Bay. This area is regarded as being very prospective for Mid-Proterozoic mafic/ultramafic - hosted...-
Document
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-50, Black Hill JV Project area mafic/ultramafic intrusion - hosted nickel sulphide mineral prospects. Project interim and final reports.
In the area of the Black Hill Cambro-Ordovician layered basic intrusive complex located between Cambrai, Swan Reach and Florieton, Inco Resources identified six geophysical (density contrast and magnetic) anomalies, interpreted as being closely...-
Document
Published: 06 Dec 1906
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 1 of 2 - a very long abstract is split between these two parts].
Exploration of a long-held tenement package in the northern Gawler Craton was directed primarily at gold and also at platinum group metals, in specific work programmes executed under separate early joint venture arrangements made with Gawler Gold and...-
Document
Published: 10 Jan 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-17, Mount Moulden and Mount Harcus mineral prospects. Project final report.
As part of the PACE Year 2 collaboration between PIRSA and the minerals industry, PepinNini Minerals proposed and was granted part subsidy funding for an extensive drilling programme in the western APY Aboriginal Lands of South Australia, to examine...-
Document
Published: 16 Jun 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-42, Talia Hill area (Harris Greenstone Domain) copper-nickel and platinum group elements mineral prospects. Project final report.
In December 2005 Mithril Resources completed five RC percussion drillholes totalling 682 m on three 100 m - spaced traverses, as one of the approved PACE Initiative Year 2 subsidised drilling projects. This drilling was intended to test a surface TEM...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-32, Ki Ki intrusion mafic/ultramafic - hosted mineral prospects. Project final report.
To further investigate the Cu-Ni-PGE mineral sulphide potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, the licensee of EL 3295 sought PACE Initiative funding to complete two...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Black Hill Intrusive Complex (northern [Bower - Florieton] and southern [Cambrai] areas). Joint annual report plus final report to licences' joint expiry/full surrender, for the period 17/2/2005 to 16/2/2007.
Inco Resources has been exploring the outcropping portion of the Ordovician Black Hill Intrusive Complex for possible Voisey's Bay style nickel, copper and platinum group element (PGE) mineralisation since 2004, when it signed a joint venture...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document