-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Granite Downs. Progress and final reports for the period 28/8/1969 to 22/10/1970.
Field reconnaissance and assessment of surface mineralisation, regional geological mapping and geochemical sampling, detailed ground magnetic and radiometric surveying, and shallow vertical percussion drilling (5 holes, total 491 feet) were carried...-
Document
Published: 22 Sep 1970
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 1916
-
Alberrie Creek (part of the Willouran Ranges Project). Annual reports plus final report to licence full surrender, for the period 9/7/2012 to 22/11/2019.
An area centred ~55 km west of Marree has been explored for possible buried economic stratiform copper and magnesite mineralisation. During the first licence year, no work occurred while Native Title land access negotiations were in progress. During...-
Document
Published: 26 Nov 1919
-
[East of] Lake Frome area (part of the Benagerie Ridge JV Project). Annual reports and final report to licence expiry/full surrender, for the period 10/10/2002 to 9/10/2012.
EL 3019 located in the Curnamona Province of South Australia covers a portion of the north-south trending buried palaeotopographic high known as the Benagerie Ridge. The north-south elongate licence area occupies part of Quinyambie Station, and is...-
Document
-
Harris Bluff. Annual reports plus final report to licence expiry/full surrender, for the period 21/6/2006 to 18/10/2015.
An area located immediately north of Lake Gilles and centred on Harris Bluff in the Uno Range was taken up to explore for possible buried unconformity style uranium mineralisation which could have formed at the base of the Corunna Conglomerate, and...-
Document
Published: 29 Sep 1915
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1977 to 10/8/1979.
At the commencement of the term of the subject licence, exploratory/appraisal diamond drilling using a single rig was continued on the Olympic Dam gravity anomaly by the licensee for gathering more geological information to use to try to understand...-
Document
-
RB 22/00009 Mineral resources of South Australia and their utilization.
There is no abstract created for this record-
Document
Published: 27 May 1946
-
RB 2016/00027 The Gluepot Granite: CA-TIMS geochronology and constraints on the timing of deformation on northeastern Eyre Peninsula.
The Gluepot Granite is a heterogeneous granite comprising coarse-grained porphyritic granite and medium-grained equigranular granite, as well as late stage pegmatite and aplite phases. It occurs as a large pluton intruding the c. 1755 Ma Moonabie...-
Document
Published: 01 Jun 2017
-
RB 2008/00004 Definitions of Mesoproterozoic igneous rocks of the Curnamona Province: the Ninnerie Supersuite.
The Curnamona Province has been host to widespread magmatic activity, with several periods of granite emplacement recorded, variously extending from the late Palaeoproterozoic to early Mesoproterozoic. Mesoproterozoic granites and volcanic rocks occur...-
Document
Published: 01 Jul 2008
-
RB 2008/00011 Definition of the Cultana Subsuite, Gawler Craton: a high level felsic Hiltaba Suite age intrusive with hydrothermal alteration and brecciation.
This paper provides a formal definition of the Cultana Subsuite, outlining the igneous petrology of the intrusion, its geochemical characteristics, and the nature of hydrothermal alteration and brecciation affecting the rocks. The Cultana Subsuite is...-
Document
Published: 01 Sep 2008
-
Krystal (part of Edward Creek Project). Annual reports to licence expiry/full surrender for the period 14/2/2002 to 13/2/2005.
Diamond exploration carried out within an area lying to the south-southwest of the Peake and Denison Ranges has aimed to find potential kimberlite sources for nine diamonds, previously recovered by De Beers from surface bulk samples, that were...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Joint annual reports for the period 1/1/2008 to 31/12/2010.
In an agreement with Oxiana, Toro Energy Limited has Uranium rights covering the Project area. In 2008, exploration activities within tenements comprising the Mount Woods Project targeted iron oxide copper gold (IOCG) style mineralisation. Drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 3 of 4 ].
During July 2000, the Minotaur Resources Ltd / Billiton Exploration Australia Pty Ltd mineral exploration alliance entity agreed to farm into the four Coober Pedy Project tenements held by Normandy Exploration (80%), Sons of Gwalia (13%) and Sabatica...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 4 of 4 ].
In 2006, work completed on the Prominent Hill Project in the reporting period included drilling of 17 RC holes for 4,255 m and 46 mud/diamond holes at Prominent Hill prospect for 14,301.5 m. The drilling at Prominent Hill intersected wide zones of...-
Document
-
Mineral Resource Potential Map Series - Willochra.
There is no abstract created for this record-
Map
Published: 01 Sep 1916
-
Plumbago - Glenorchy area [= Olary 'B' Farmin Block]. Progress and final reports to licence expiry/full surrender for the period 10/2/1972 to 9/2/1973.
In a search for possible remaining economic primary or secondary uranium deposits in an area of known such mineral occurrences located around Mount Victoria, a consultant was engaged by Esso Minerals to conduct detailed 1:12,000 scale geological...-
Document
-
Ethiudna [= Olary 'B' Farmin Block]. Progress reports to licence expiry/renewal for the period 14/1/1971 to 13/1/1972.
Exploration carried out mainly to look for possible large primary deposits of uranium ore in localities surrounding Ethiudna Hill initially addressed the potential of several hard rock showings of uranium mineralisation which had been found by...-
Document