-
Truro. Progress reports to licence expiry/full surrender, for the period 15/7/1991 to 29/10/1997.
Gold, base metal and diamond exploration carried out over a small area located immediately south-east of Truro has comprised detailed BLEG stream sediment sampling across the licence, limited rock chip geochemical sampling of quartz veins, alluvium...-
Document
Published: 15 Apr 1998
-
Half Moon Lake (part of the Eucla Project). First partial surrender report for the period 17/2/2005 to 16/2/2009.
An area located approximately 120 km north-west of Tarcoola and immediately to the west of the Challenger gold mine is being explored for possible economic sedimentary uranium mineralisation which is inferred to be present in buried Tertiary...-
Document
-
Indooroopilly Outstation (part of the Eucla Project). First partial surrender report for the period 12/6/2003 to 14/7/2009.
An area located approximately 160 km south-west of Coober Pedy and just to the west of the Challenger gold mine is being explored for possible economic sedimentary uranium mineralisation which is inferred to be present in buried Tertiary...-
Document
-
Tallaringa South (part of the Eucla Project). First partial surrender report for the period 15/8/2005 to 14/8/2009.
An area located approximately 150 km north-west of Tarcoola and 30-45 km south-west of the Challenger gold mine is being explored for possible economic sedimentary uranium mineralisation which is inferred to be present in buried Tertiary...-
Document
-
Mount Christie Siding (part of the Eucla Project). First partial surrender report for the period 26/7/2005 to 25/7/2009.
Mt Christie Siding EL 3380 straddles the Transcontinental Railway north of the Great Australian Bight in the far west of South Australia, approximately 140 km west-northwest of Tarcoola. There is an extensive cover of aeolian sand extending throughout...-
Document
-
Data release [made at SA Director of Mines' discretion] : Stuart Creek (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 30/1/1976 to 29/1/1978.
An area located immediately west of the northern tip of Lake Torrens, and covered by the dunefield in which the head of Stuart Creek rises, was taken under licence by Western Mining Corp. (WMC) to document the stratigraphic section present on the...-
Document
-
Ooldea Range (part of the Eucla Basin Project). Annual reports, including those for the commencement of licence joint annual reporting for the Eucla Basin Mineral Sands Tenement Group 1, for the period 5/3/2002 to 28/2/2009.
The geomorphic feature known as the Ooldea Range, a prominent Eocene dune formed at the limit of the marine transgression on the eastern margin of the Eucla Basin, has now been taken under licence by WA-based company Iluka Resources to explore for...-
Document
-
Mount Christie Siding (part of the Eucla Project). Annual reports and final report to licence expiry/full surrender, for the period 26/7/2005 to 20/3/2013.
The subject licence area, one of eight tenements which constitute Hindmarsh Resources Limited’s (Hindmarsh’s) Eucla [Basin] Project, has been explored for possible buried economic sedimentary uranium deposits that may have formed in Tertiary...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mutooroo. Annual reports to licence expiry/renewal, for the period 16/1/1997 to 2/4/2007. [ Index Part 1 of 2 ].
Palaeoproterozoic Willyama Supergroup metasediments, intrusive igneous rocks and volcanic rocks, plus Mesoproterozoic granitoids and associated mafic dykes, which occupy the south-western corner of the Broken Hill basement domain in an area centred...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Cone (subsequently part of the Burra North Project). Annual reports submitted until the commencement of project licences' joint reporting, for the period 6/3/2007 to 5/3/2009.
An area of 300 square km located immediately north and north-east of Burra was taken up because it is considered to be prospective for gold and copper mineralisation related to Cambro-Ordovician sediments and late-stage felsic and mafic intrusives,...-
Document
-
Data release [made at SA Director of Mines' discretion] : Yumbarra (part of the Gawler Joint Venture Project). Environmental monitoring assessment report and management plan.
Pursuant to recently proclaimed legislation governing the conduct of prospecting, exploration and mining in the Yumbarra Conservation Park, the Gawler Joint Venture partners commissioned ecologia Environmental Consultants to conduct a series of...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Glenloth area (the Tarcoola JV Project). Annual reports for the period 11/7/2008 to 2/11/2018.
A biogeochemical sampling survey consisting of 20 lines (407 samples) was undertaken by the JV partners during August 2009, targeting buried gold mineralisation. Black Oak and Pearl Bluebush were the dominant deep-rooted plant species sampled and, to...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Garford [Outstation], Indooroopilly Outstation and Half Moon Lake (the Challenger West Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 30/4/2003 to 13/10/2010.
The three licences comprising the Challenger West Project were taken up principally to explore for economic gold, which could possibly occur in strike extensions of known gold lodes formed within Archaean basement rocks that constitute the Challenger...-
Document
-
Tallaringa South and Tallaringa North (part of the Eucla Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 15/8/2005 to 14/8/2010.
As part of a regional exploration project targeting possible economic secondary, roll-front style uranium deposits within buried Tertiary sediments of the Anthony Palaeochannel and its several tributaries, two areas located approximately 130-160 km...-
Document
-
Yalanda Hill. Annual reports and final report to licence full surrender, for the period 5/12/2005 to 20/3/2014.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the subject licence which is centred approximately 90 km south-west of Whyalla, initially consisted of a field reconnaissance using a spectrometer, and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Burra Hill (part of the Burra South Project). Annual reports submitted until the commencement of project licences' joint reporting, for the period 1/5/2006 to 30/4/2009.
Within a small licence area centred about 15 km south-south-east of Burra township in the northern Mount Lofty Ranges, Copper Range initially targeted near-surface copper oxide mineralisation associated with an altered and brecciated contact zone...-
Document
-
Wynbring (part of the Eucla Project). Annual reports and final report to licence expiry/full surrender, for the period 23/5/2005 to 22/5/2010.
As part of a regional exploration project targeting possible economic buried secondary, roll-front style uranium deposits within Tertiary sediments of the Wynbring Palaeochannel and its several tributaries, an area located approximately 75 km...-
Document
-
Sedan and Anna coal deposits (the Mannum Project). Data release upon the surrender of a subsequent licence (EL 4269): Coal mining feasibility studies. Expert reports plus supporting data for the period February 1981 to June 1987.
Deposits of low rank Tertiary brown coal formed in the Sedan area on the western margin of the Murray Basin, ~80 to 100 km north-east of Adelaide, have been investigated as potential sources of fuel for electricity generation. Attention has been...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bald Hill North. Annual reports for the period 25/7/2006 to 24/7/2009.
A small area centred ~5 km west of Burra township is being explored for possible buried economic, Monster mine type stratiform copper oxide or copper carbonate deposits, thought to be associated with poorly exposed fault structures and related...-
Document