-
Kangaroo Flat hydrogeological investigation - Well drilling.
The Department for Water Resources drilled three wells at Kangaroo Flat in October and November 2000 as part of a hydrogeological investigation of the area. The wells were drilled as observation wells, and water levels will subsequently be monitored...-
Document
-
RB 59/00037 Foundation investigations, new government building, Victoria Square.
This report contains information used by the staff at the Geological Survey at various times as a basis for advice to authorise responsible for construction of the new Government Offices at Victoria Square. It is not therefore an integrated report. A...-
Document
Published: 01 Jan 1964
-
RB 58/00126 New government building, Victoria Square, foundation stratigraphy.
There is no abstract created for this record-
Document
Published: 01 Jan 1964
-
RB 78/00007 Drilling and completion report, Diverse Products Ltd well no. 4.
A water well was drilled on Section 1, Hundred of Adelaide to provide an increased supply of groundwater for Diverse Products Ltd. The well was rotary drilled to a depth of 125 metres and completed open hole in Tertiary limestone. Production testing...-
Document
Published: 01 Jan 1978
-
RB 78/00138 Drilling and completion report, Marion golf course water wells (Client - Marion City Council).
2 water production wells were completed.-
Document
Published: 01 Jan 1978
-
RB 81/00101 Sturt Oval water well completion report.
Production well was successfully completed into the Tertiary Port Willunga Beds. Although the well capacity is in excess of 2.5 L/sec, the pumping rate should not exceed 2.25 L/sec. Higher rates will lead to significant silt / sand entry through the...-
Document
Published: 01 Dec 1981
-
RB 77/00061 Marion Golf Course groundwater investigation progress report no. 2.
Rotary drilling of a scout water well north of the Eden - Burnside Fault, penetrated a productive limestone aquifer between 63 and 102 metres in the Port Willunga Beds, within the Adelaide Plains sedimentary basin. Production testing indicates that a...-
Document
Published: 01 Jan 1977
-
RB 94/00009 Soils, stratigraphy and engineering geology of near surface materials of the Adelaide Plains.
Metropolitan Adelaide is founded on a wide variety of soils that overlie sediments and rocks. Some of the soils and sediments react to seasonal and human-induced changes in water content with marked changes in volume. The black earths and...-
Document
Published: 01 Jul 1996
-
RB 97/00014 Aquifer storage and recovery, MFP Australia, The Levels. Progress report no. 1.
Mines and Energy South Australia (MESA) was commissioned by MFP Australia to undertake an investigation into the feasibility of establishing an Aquifer Storage and Recovery (ASR) scheme at The Levels site. The programme is being carried out in two...-
Document
Published: 01 Mar 1997
-
RB 95/00004 Willunga Basin. Review of hydrogeology and water budget.
The Willunga Basin is a groundwater resource being stressed by groundwater abstraction for agricultural purposes. The Southern Vales Water Resources Committee, in conjunction with MESA, DENR and SA WATER, are developing groundwater management...-
Document
Published: 01 Jul 1995
-
RB 97/00045 Briefing on Adelaide South Parklands aquifer storage and recovery potential.
MESA has been approached by civil engineering firm B.C. Tonkin and Associates to help with assessing the possibility of developing an aquifer storage and recovery scheme in the Adelaide South Parklands. Their client the Adelaide City Council is...-
Document
Published: 01 Aug 1997
-
Report of foundation investigation at the Union Building, Adelaide University. July, 1968 and May-June, 1969.
There is no abstract created for this record-
Document
Published: 01 Jan 1969
-
Adelaide subway study stage 1. Expansion into North and West Adelaide. Survey of geology, buildings and underground services.
There is no abstract created for this record-
Document
Published: 01 Jan 1974
-
Bull 051 Engineering Geology of the Adelaide City Area
The importance of engineering geology has been emphasised since the 1950s. when construction commenced in the city of a new generation of multistorey buildings. Foundation drilling along with geological and geophysical services provided by the...-
Document
-
RB 67/00006 Chemistry Building Forensic Laboratory, Kintore Ave, Hd Adelaide. Geological investigations, progress report no. 1, design stage.
Foundation investigations for the proposed Chemistry Building, Forensic Laboratories in Kintore Avenue, were requested in a Minute from the Director, Public Buildings Department dated 1st September 1966. The proposed building is rectangular in shape,...-
Document
Published: 01 Jan 1968
-
RB 67/00058 Exploration for argillaceous material for cement manufacture, Yorke Peninsula - Adelaide Cement Co. Ltd.
Investigations carried out since 1964 have shown that although there are large reserves of Permian, Tertiary and Quaternary clays present near Klein Point, their chemical composition or physical characteristics render them unsuitable for use in the...-
Document
Published: 01 Jan 1970
-
RB 67/00999 Palaeontological examination of material from a building foundation test bore located near Kintore Avenue, Adelaide.
There is no abstract created for this record-
Document
Published: 19 Jan 1967
-
RB 66/00128 Waymouth Street Telephone Exchange geological investigations - Progress report no. 2, design stage T/A 199, Hd Adelaide.
Further drilling to determine foundation conditions at the proposed Waymouth Street Telephone Exchange was requested in a letter from the Director of Works dated 5th February. It was requested that this work be carried out in liaison with Soilmech Pty...-
Document
Published: 01 Jan 1968
-
RB 66/00072 Commonwealth Law Courts building, geological investigations progress report no.1, design stage TA 453, Hd Adelaide - Commonwealth Department of Works.
Foundation investigations for the proposed Commonwealth Law Courts Building were requested in a letter dated 3rd November, 1967 from the Acting Director of Works. The proposed building will be about 130 feet long and 100 feet wide. No other details...-
Document
Published: 01 Jan 1968
-
RB 72/00237 Forensic Science and Motor Vehicles Department buildings, TA 300, 301, Hd Adelaide. Foundation investigations, design stage - Public Buildings Department.
Drilling to determine foundation conditions for the proposed Forensic Science and Motor Vehicles Buildings was requested by Mr. A. Dancauskis of the Public Buildings Department. The two buildings will be from 6 to 9 stories high, will have basements,...-
Document
Published: 08 Dec 1972