-
RB 2011/00003 PACE Geochronology: Results of collaborative geochronology projects [performed during] 2009-2010.
This report book presents the results of seven geochronology research projects completed during 2009 and 2010 as a new part of the ongoing PACE Initiative geoscientific data gathering activity underwritten by the South Australian Government. It has...-
Document
Published: 01 Apr 2011
-
RB 2013/00013 Zircon and monazite geochronology via SHRIMP and LA-ICPMS for the northern Gawler Craton, from 2009 GOMA Drilling.
The 2010 GOMA basement drilling program formed part of a collaborative ARC Linkage Project LP0882000 " Unearthing the marginal terrains of the South Australian Craton: Keystone of Proterozoic Australia " arranged between Primary Industries and...-
Document
Published: 01 Dec 2013
-
RB 2010/00002 GOMA basement drilling program, northern Gawler Craton.
The GOMA basement drilling program was named after the Gawler-Officer-Musgrave-Amadeus deep seismic reflection survey line, that was completed in 2008 by Geoscience Australia (GA) as part of its Onshore Energy Security Program. Funding for the seismic...-
Document
Published: 01 Feb 2010
-
RB 76/00095 Explanatory Notes and hydrogeology for the MURLOOCOPPIE 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Jul 1976
-
ExpNotes MURLOOCOPPIE: Explanatory Notes MURLOOCOPPIE.
There is no abstract created for this record-
Document
-
Yarrana Hill, Dunn Hill, Wallala Hill and Mount Centre (the Ceduna heavy minerals Project). Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 21/12/1989 to 20/6/1991.
TARGET: Possible Tertiary marine placer deposits of heavy mineral sands (ilmenite, rutile, zircon) on the south-eastern margin of the Eucla Basin in the Nunjikompita - Hiltaba area, 100 km east of Ceduna. EXPLORATION: A consultants' photogeological...-
Document
Published: 16 Oct 1991
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1978 to 28/9/1979.
As part of ongoing base metal exploration of the area surrounding Bute, initial work done after the expiry of EL 248 comprised the completion of one diamond drillhole to TD 411.2 m within Carpentarian basement, targeting a magnetic anomaly thought to...-
Document
Published: 20 Nov 1979
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1976 to 9/6/1978.
There is no abstract created for this record-
Document
-
Yednalue. Second partial surrender report, for the period 29/4/2001 to 8/5/2014.
Early during licence Year 13, two separate portions of EL 4935 together totalling 46 square km or 83.6% of the licence's former area have been relinquished due to the chance of discovery there of gold and base metals by a small, self-funded explorer...-
Document
Published: 25 Mar 1914
-
Data release - as updated : Cultana (latterly part of the Spencer Project). Annual reports to licence expiry/full surrender, for the period 19/4/2006 to 12/9/2017.
An area located 30 km south of Port Augusta and covering more than 792 square km east of the main highway between Port Augusta and Whyalla, which falls entirely within part of the Cultana Army Training Area held by the Australian Commonwealth...-
Document
Published: 06 Oct 1917
-
Regulated Substance Public Call
Public Calls are areas of land offered to explorers with the view to attracting exploration programs under formal licences for the exploration of regulated substances. These call areas are frequently accompanied by substantial data packages....-
Dataset