-
Data release [made at SA Director of Mines’ discretion] : Weetulta. Annual reports for the period 16/9/2005 to 15/9/2009.
EL 3413, surrounding the township of Weetulta on the Yorke Peninsula, is located geologically along the prospective south-eastern margin of the Gawler Craton. The licence area, which lies only about 10 km south of Moonta, has several historic mines...-
Document
Published: 20 Oct 2009
-
Christmas Dam. Annual reports to licence expiry/full surrender, for the period 9/12/2009 to 8/12/2012.
An area of probable Neoproterozoic diapirism centred ~40 km north-northwest of Leigh Creek, between Lake Watherstone and Lyndhurst, was taken up to explore for possible buried economic stratiform / stratabound copper mineralisation in faulted and...-
Document
Published: 11 Jan 2013
-
Bews and Parrakie. Joint first annual/final report at licences' joint full surrender, for the period 19/6/2012 to 9/4/2013.
Two adjoining areas centred ~ 75 km east of Tailem Bend have been explored for possible economic buried Tertiary marine placer heavy mineral sand (HMS) deposits that may have been formed within the Murray Basin sedimentary succession, as winnowed...-
Document
Published: 13 May 2013
-
Kanmantoo. Data release made in lieu of submitting a first partial surrender report at licence renewal [part]: progress reports and annual reports to licence expiry/renewal, for the period 1/8/1996 to 31/7/1999. [Index Part 3 of 3].
On assuming operatorship of EL 1965 through joint venture by its subsidiary Kelaray Pty Ltd, Pima Mining NL undertook a regional bedrock geochemical sampling programme by auger drilling during January-March 1997 a total of 3326 vertical holes, 0.3 to...-
Document
Published: 11 Mar 2004
-
Coober Pedy (part of the Mabel Creek Project). First annual report [jointly with EL 4117 Ant Hill] and project final report at subject licence surrender, for the period 26/3/2008 to 2/3/2010.
Six geophysical anomalies defined within the pre-Mesozoic basement in an area centred about 40 km north-northwest of Coober Pedy have been explored for their IOCG mineralisation potential. Exploration comprised a review and compilation of open file...-
Document
Published: 29 Mar 2010
-
Coonalpyn (part of the Coonalpyn Joint Venture Project). Annual reports to licence expiry/full surrender for the period 16/10/2006 to 15/10/2008.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, as well as exploring for base metal mineralisation...-
Document
Published: 13 Nov 2008
-
Mount Darling. Annual reports and final report to licence expiry/full surrender, for the period 3/8/2004 to 2/8/2008.
An area located 3 km south of the South Australia/Northern Territory border and 50 km east of the Stuart Highway, on the eastern margin of the Musgrave Block, was considered prospective for nickel and platinoid metal mineralisation hosted by layered...-
Document
Published: 20 Dec 2008
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine. Annual reports for the period 13/3/2000 to 1/11/2013.
Exploration Licence 2704 covering 23 square km surrounding the historic abandoned Mutooroo copper mine, located ~55 km east of Olary, was granted to Havilah Resources NL so that the company could assess the economic potential of the remaining sulphide...-
Document
Published: 02 Dec 2013
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 2012
-
Francis Swamp. Combined first and second annual reports/final report to licence expiry/full surrender, for the period 9/10/2013 to 8/10/2015.
An area believed to cover the concealed southern margin of the Peake and Denison Domain of the Northern Gawler Craton was taken up by the Monax-Antofagasta copper exploration consortium to explore for possible buried economic iron-oxide associated...-
Document
Published: 24 Nov 2015
-
Gilles Downs (part of the West Middleback Project). First partial surrender report, for the period 8/7/2005 to 7/7/2008.
Three small areas totalling 150 square km have been relinquished from the western extremities of the two sub-blocks forming the subject licence. The only work conducted on this ground was the acquisition for the licensee during February 2007 of parts...-
Document
Published: 20 May 2008
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 2017