RB 94/00043 Brukunga drilling, 1993-1994.
This report details drilling programs carried out by MESA at and near the Brukunga open-cut pyrite mine and tailings dam areas in the period 6/5/93 to 14/4/94. A total of 29 wells were drilled within the tailings dam, the spoil heaps and on the hills...-
Document
Published: 01 Nov 1994
-
Rehabilitation of the Nairne Pyrites Ltd quarry area and treatment of acidic effluent. Progress and final reports on investigations for the period March 1973 to June 1975.
A chemical survey of Dawesley Creek in the Brukunga Mine area has concluded that seepages from the southern mine waste dumps located alongside the creek contribute the greater proportion of pollutants (acidity, iron, aluminium, manganese, zinc,...-
Document
-
Rehabilitation of Brukunga mine. Progress, final and miscellaneous reports for the period from November 1974 to April 1989.
There is no abstract created for this record-
Document
Published: 01 Jan 1989
-
RB 74/00222 Amdel 01015 Rehabilitation of Brukunga mine, Nairne Pyrites Ltd.
This investigation of the Brukunga mine site was prompted by the observed release of acid waters with high iron and other heavy metal concentrations into Dawesley Creek, the consequences of which could include possible pollution of Lake Alexandrina...-
Document
Published: 01 Nov 1974
-
RB 75/00092;Amdel 01065 Nairne Pyrites' effluent, 1974/1975.
Work included a chemical survey of Dawesley Creek, analysis of soil samples from the Langhorne Creek area for evidence of concentrations of heavy metals, a lime neutralisation test, examination of soil characteristics for revegetation of the mine...-
Document
Published: 01 Jul 1975
-
RB 26/00118 Gibraltar pyrite deposit near Nairne, SA.
Ideal location - 26 miles from Adelaide - good climate. 3½ miles from Nairne on Adelaide-Melbourne railway line. Electric supply to Nairne-Power requirements could probably be obtained from supply company. Small flow permanent water beside deposit,...-
Document
Published: 15 Nov 1949
-
RB 2015/00019 Manual of geochemical leaching trials, 2010–2014; Brukunga Mine Remediation Program - Phase 3.
The Brukunga mine site is a former open pit iron sulfide mine that continues to contribute to Acid and Metalliferous Drainage (AMD) into downstream waterways. Mine-based sources of AMD include the waste rock dumps and tailings storage facility. In...-
Document
Published: 01 Jun 2015
-
RB 2000/00019 Dawesley Bremer Catchment, phase 2 sampling program for potential environmental contaminants.
A previous regional soil and stream sediment sampling program (cf. RB 2000/00002) has delineated areas of heavy metal contamination in the Dawesley-Bremer Catchment. Heavy metal contamination was found to occur sporadically along both Dawesley Creek...-
Document
Published: 01 May 2000
-
RB 2000/00002 Soil and stream sediment sampling of the Dawesley-Bremer Catchment for potential environmental contaminants.
A program of soil and stream sediment sampling was conducted along the Dawesley - Bremer Catchment to determine the extent and magnitude of potential heavy metal contamination downstream from the Brukunga Pyrite Mine. Arsenic, cadmium, copper and zinc...-
Document
Published: 01 Jan 2000
-
Bull Creek. Progress reports and final report to licence full surrender, for the period 21/3/1980 to 6/3/1985.
As part of a regional search for possible economic buried Cambrian stratabound lead-zinc mineralisation, anomalous bedrock zones defined by aerial magnetic, radiometric and INPUT surveys and by stream sediment sampling were followed up with soil and...-
Document
Published: 23 Apr 1985
-
RB 2024/00022 Secondary prospectivity of South Australia’s mine waste - Brukunga.
The Geological Survey of South Australia has recognised there is great potential to explore for critical metals in mine waste materials across the state forming part of a new supply chain. This report has sampled waste rock, tailings and processing...-
Document
Published: 01 Jul 2024