-
RB 99/00032 Trial dewatering of the BHP dolomite quarry at Ardrossan, South Australia.
Trial dewatering of the quarry, which is excavated in fractured and well-bedded Cambrian dolomite, took place for at least 56 days during early 1994, but pumping was terminated when a further significant water level drawdown could not be achieved. Ten...-
Document
Published: 01 Dec 1999
-
Maitland [second JV programme]. Progress reports for the period 17/8/81 to 14/5/84.
Continuing mineral exploration work over central Yorke Peninsula under a new joint venture arrangement with a different company, now targetting possible Phanerozoic sedimentary uranium in Cambrian and Tertiary strata, has consisted of investigations...-
Document