-
Green Patch. Progress and final relinquishment reports for the period 17/2/1977 to 16/2/1978.
Investigation of banded iron formation in the Lincoln Uplands of the Green Patch district for possible South West African type base metal sulphide deposits, consisted of rock chip and stored drill core sampling for trace metal and whole rock silicate...-
Document
Published: 06 Jan 1978
-
Pillaworta Hill. Progress and final reports for the period 22/12/1976 to 4/9/1978.
Investigation of banded iron formation in the Lincoln Uplands of the Tumby Bay district for possible South West African type base metal sulphide deposits consisted of rock chip and soil sampling at potential gossanous outcrops, and limited drilling of...-
Document
Published: 22 Jun 1978
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-29, Wilcherry Hill Magnetite Project, Hercules Proterozoic stratabound iron ore mineral prospect. Project interim and final reports.
Iron ore mineralisation similar to that mined in the Middleback Range has been investigated at the Hercules prospect, located 90 km west-northwest of Whyalla, where a large, high intensity aeromagnetic anomaly and associated 12 km long outcrop of...-
Document