-
Assessment of the Environmental Impact Statement prepared for Cape Investments Pty Ltd on the residential land division at Thompson Beach pursuant to section 49, the Planning Act, 1982.
Concludes that the project conflicts with planning and coastal management policies and that it would result in significant impact to the biological system of the area.-
Document
-
Seaford structure planning report.
Structure plan, staging development plan and guidelines for urban expansion. Considers Maslin Beach industrial sand mining.-
Document
-
Proposed copper mining project. Statement of environmental factors.
Drilling near Leigh Creek had delineated sufficient reserves of oxidized copper ore, for 5 years chemical operations at Burra and Port Adelaide, in 7 separate deposits in 3 areas, namely : 1) Mountain of Light : Paltridge North (formerly Mountain of...-
Document
-
Nunnyah Conservation Reserve management plan. Draft report.
Reviews cultural and natural history and environmental impact. Majority of land is in an undisturbed natural condition and could be rehabilitated to `wilderness condition in 20-30 years.-
Document
-
Draft environmental impact statement for the Mount Lofty Project.
The project proposal consists of : - tourism and communications facilities on Summit Road, Mount Lofty, - improvements to the Native Fauna Centre in Cleland Conservation Park, and - a 3.2 km cable-car linking these and a base station located on the...-
Document
-
Proposed Tungkillo to Cherry Gardens 275 kV transmission project. Draft environmental impact statement.
Proposal to complete a transmission connection from generating plant at Port Augusta to Adelaide metropolitan area. Discusses impacts on biophysical, social and economic environments, land use, tourism, heritage, aboriginal archaeological sites, water...-
Document
-
Southern Cross Refinery. Supplement to the draft Environmental Impact Statement.
Effects of proposal for petrochemical complex at Port Bonython are summarised with regard to major issues raised by Santos Ltd, Mr. A J A Scott, Corporation of the City of Whyalla, Environmental Protection Council and government departments. There...-
Document
-
Yorke Coast protection district management plan. Draft for public exhibition.
Aim is environmental protection and restoration of coastal features and development and management of its facilities.-
Document
-
Calpatanna Waterhole Conservation Park, Eyre Peninsula, South Australia. Draft management plan.
There is no abstract created for this record-
Document
-
Port Broughton Beta-carotene Project. Pilot plant proposal.
Construction of saline lagoon on supratidal mud and samphire flats is proposed to test suitability of area for growth and harvesting of the marine algae Dunaliella salina and extraction of beta-carotene, oil and glycerol. Possible discharge of waste...-
Document
Published: 01 Jan 1984
-
Simpson Desert Conservation Park. Draft management plan.
Proposals to minimise land use conflict and hazards to travellers. Summarises natural resources of desert region.-
Document
-
Geographic appraisal of Hallett Cove and environs, South Australia.
The geological, geomorphic, topographic, climatic, floral, soil types, economic and cultural aspects and broad environmental zones were documented. Areas of scientific, educational, recreational, and aesthetic value for preservation, public use, and /...-
Document
-
1992 seismic survey, Crater, final report.
AIM: Previous semi-detailed seismic mapping of the licence area by the former PELs 5 and 6 licensees had identified several prospects and leads worthy of follow-up detailed seismic work. 7 new lines of infill seismic totalling 60 line km were...-
Document
-
Harbour investigations Gulf of St Vincent areas A and B.
Investigated bottom and shallow sub - bottom conditions, suitability for installation of harbour facilities and dredging. No materials encountered should impede dredging operations. High resolution and standard boomers were used for sound sources.-
Document
-
Application for mining leases, Mineral Claims nos 2292 and 2293 [includes mine development and rehabilitation proposal].
There is no abstract created for this record-
Document
Published: 16 Jan 1989
-
City of Port Augusta - Stirling North deviation drain. Supplementary development plan by the Council.
Controls relating to development within the 100 year recurrence interval flood plain of Saltia Creek and the construction of a deviation drain designed to eleminate flood risk to the Stirling North township.-
Document
Published: 01 Jan 1986
-
DC Mount Remarkable. Supplementary development plan by the Council. For exhibition.
There is no abstract created for this record-
Document
Published: 01 Jan 1985
-
Mount Lofty Ranges bushfire prone area. Supplementary development plan. For exhibition.
Amendment to overcome previous development strategies which paid inadequate attention to land division, building design and siting guidelines. Management strategy is based on discretionary principles of development control at 2 levels of bushfire...-
Document
Published: 01 Jan 1987
-
Mine development at Iron Duke - Iron Duchess. Environmental impact and land use planning reports.
There is no abstract created for this record-
Document
Published: 01 Jan 1984
-
Agreement re Innamincka Station proposed regional reserve - Coongie Lakes Control Zone.
Agreement of definition of Coongie Lake as a discrete area of particular environmental significance within the Reserve and the methodology of exploration, drilling, workover operations development and production operations for conservation of the...-
Document
Published: 16 Mar 1988