-
RB 74/00163 Proposed sediment screen dam to be built at Aroona Reservoir.
The construction of a sediment screen dam in the upper reaches of Aroona Reservoir is expected to reduce the present high rate of siltation within the reservoir. To aid in the design of this dam, information on bedrock conditions was sought, and to...-
Document
Published: 01 Jan 1977
-
Lyndhurst. Progress reports and final report to licence expiry/full surrender, for the period 16/1/1980 to 15/1/1981.
70 line km of gravity traverses were undertaken over potential shallow Triassic coal basins preserved by downwarping in the Lyndhurst area, prior to rotary mud and air drilling of gravity lows (15 holes, total 1,112.85 m, including 7.35 m of coring,...-
Document
-
Finniss Springs. Progress reports for the period 27/5/80 to 26/1/83.
Base metal exploration carried out 70 km west and south-west of Marree, to investigate the potential for Olympic Dam - type mineralisation in concealed pre-Adelaidean rocks, has included geochemical rock chip and water sampling, an aerial radiometric...-
Document
Published: 21 Feb 1983