-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-01, Central Eyre Peninsula (Karkarook area) Mesoproterozoic unconformity - style sedimentary uranium mineral prospects. Project interim and final reports.
Investigation of the potential of a known surface radiometrically-anomalous area 20 km west-southwest of Cleve to contain unconformity - style uranium mineralisation, inferred to occur at and just above the subsurface stratigraphic contact of...-
Document
Published: 31 Mar 1907
-
Data release [made at SA Director of Mines' discretion] : Tumby Bay. Annual reports [to the 24/11/2006 commencement of the Eyre Peninsula Project licences' combined reporting status] for the period 18/1/2002 to 17/1/2007.
Exploration Licence 2887 Tumby Bay was taken out to cover prospective magnetite rich Banded Iron Formations (BIF) close to the eastern coast of the Eyre Peninsula. Potential was seen for a magnetite concentrate export operation taking advantage of...-
Document
Published: 05 Mar 1907
-
Bull 033 The Geology and Iron Ore Resources of the Middleback Range Area
This report deals comprehensively with the physiography, prospect geology, and ore genesis, and includes an assessment of the iron ore reserves and other mineral resources of an area which has been almost the sole source of the iron ore used in...-
Document
-
Woollinie. Progress reports and annual reports plus final report to licence full surrender, for the period 20/12/1991 to 20/11/1995.
Exploration for Broken Hill / Menninnie Dam type Pb-Zn, and later for iron oxide - associated Cu-Au, that was undertaken over an area located north of Kimba within and adjacent to the Pinkawillinie Conservation Park, comprised the acquisition during...-
Document