-
Data release [made at SA Director of Mines’ discretion] : Mount Pitt (part of the Gunsight JV Project). Progress reports and final report to licence full surrender, for the period 24/1/1983 to 9/11/1983.
Exploration for possible economic buried base metal or uranium primary mineralisation that could have formed in Proterozoic metasedimentary and metavolcanic basement rocks within a small area located north-west of Mount Painter consisted only of...-
Document
-
Interpretation and evaluation of the Gunsight prospect.
Gunsight prospect was discovered in the late 1960s during the follow-up of anomalous copper detected by a stream sediment survey. In 1972-73 Dampier Mining Pty Ltd drilled eleven percussion holes (totalling 537 m) and eleven diamond holes (1764 m)...-
Document
-
Re-evaluation of the 1979 Gunsight Project stream sediment survey.
This report re-evaluates the assay data obtained from the 1979 stream sediment geochemistry programme carried out for Marathon Petroleum by N.J. Marshall and Associates within the Gunsight Project areas, and recommends follow-up work. Samples taken by...-
Document