Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Data release - as updated [made at SA Director of Mines' discretion] : the Adelaide Hills Project. Joint annual reports for the period 16/5/2005 to 31/12/2013.
The Adelaide Hills Project consists of 3419 square km of land covered by eight contiguous exploration licences, ELs 3057, 3064, 3141, 3215, 3239, 3277, 3425 and 3534, which are owned by or joint ventured to Flinders Diamonds Limited (FDL). By an...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby Downs, Acropolis South, Parakylia, Roxby Downs North, Hidden Swamp and Roxby Downs (the Theseus Project). Joint annual reports for the period 4/5/2012 to 30/6/2018.
Brownfields exploration for possible buried economic Mesoproterozoic basement-hosted IOCG type mineralisation, so far undertaken by BHP Billiton ('BHPB') within six semi-contiguous licences together covering an area extending from 40 km south to 68 km...-
Document
-
A new approach to mapping basin architecture using airborne magnetotelluric survey data - the Copper Coast Project trial. Final report, Project ADI RD02-306 [part of Accelerated Discovery Initiative Round 2, 2022].
IGO Ltd’s (IGO) Copper Coast Project is located along the eastern margin of the Gawler Craton in South Australia, and covers Proterozoic rocks of the Stuart Shelf, Torrens Hinge Zone and Adelaide Rift Complex, which form part of the Adelaide...-
Document
Published: 21 Mar 1922
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 1912
-
Preliminary mine planning and costing study, Wintinna Coal Deposit.
The 2000 Mt Wintinna coal deposit is located approximately 700 km north-northwest of Port Augusta in South Australia. The area has opencut potential, and is proposed for development to supply a thermal power station. Meekatharra Minerals Ltd holds...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Midgee (latterly part of the Cowell JV Project). Annual reports for the period 26/11/2003 to 24/3/2019.
An area of the northern Cowell Hills was taken up to explore for possible economic basement-hosted copper-gold mineralisation of epigenetic style, analogous to that found at the Ernest Henry deposit, which may be associated with magnetic anomalies and...-
Document
Published: 08 May 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Nullarbor, Yalata North and Yalata East (the Western Gawler Craton Project). Joint annual reports for the period 24/10/2012 to 2/4/2018.
A cluster of adjoining licence sub-blocks taken up in the Yalata region are being explored for possible buried Thompson Belt style magmatic copper-nickel mineralisation which could be associated with large strike-slip fault structures transecting the...-
Document
-
Cadaree Hill and Codna Hill. [Coal exploration joint venture] Joint progress reports and joint final report to licences' joint surrender, for the period 4/5/1984 to 15/5/1990.
TARGET: Permian coal in the Mount Toondina Formation. EXPLORATION: Sirotem and Mini-Sosie reflection seismic surveys, plus regional and detailed exploratory rotary mud drilling of 56 holes totalling 11,007 m, with 6 partly cored holes (511 m cored)....-
Document
-
Goulds Dam and Katchiwilleroo Dam (temporarily part of the Goulds Dam JV Project). Data release made at licences' joint expiry/lapse of tenure : joint annual reports for the period 27/8/2009 to 26/8/2014.
During 2009-2010, the first year of the subject licences' joint annual reporting, 27 vertical open exploratory rotary mud holes were drilled to basement on EL 3905 Goulds Dam for a total penetration of 3564 m, to search for redox fronts that may exist...-
Document
Published: 23 Oct 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
South Eagle. Progress and technical reports for the period 21/12/1977 to 2/11/1984.
TARGET: Ongoing evaluation of the Honeymoon deposit. EXPLORATION: Pilot wellfield drilling (48 holes) on a 60 m by 30 m grid over the eastern half of the deposit, hydrological investigations, metallurgical testing, and in-situ push-pull leaching...-
Document
Published: 10 Nov 1984
-
Yednalue. First partial surrender report, for the period 29/4/2001 to 30/11/2013.
During licence Year 12, a portion of EL 4935 Yednalue totalling 20 square km or ~26.7% of its former area has been relinquished due to the chance of discovery there of gold and base metals by a small, self-funded explorer becoming seen as...-
Document
Published: 02 Dec 1913
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-05 - Areva Resources Australia Pty Ltd, Denison Range Project, eastern flank Mesozoic sandstone-hosted uranium targets. Drilling project final report.
Areva's Denison Range Project is targeting possible economic sandstone-hosted uranium mineralisation that may have formed within the Mesozoic sandstones located to the east of exposed uranium-rich basement rock sequences of the Palaeo- to...-
Document
Published: 29 Aug 1913
-
Willouran Ranges and Leigh Creek North. Joint venture - related individual licence annual reports, partial surrender reports and final reports to licences' respective expiry/full surrender, for the period June 1998 to 18/11/2003.
A partly defined magnesite resource thought to be of the order of 579 million tonnes in size, consisting of a series of semi-continuously outcropping magnesite beds ranging in thickness from 0.5 m to 9.0 m, is situated within the northern Flinders...-
Document