-
Data release - as updated [made at SA Director of Mines' discretion] : North-west Olympic Domain Project. Joint annual reports plus annual reports for the period 8/10/2013 to 7/10/2018. Plus partial/expiry/full surrender reports to 24/04/2024.
Ten licences distributed across a broad region of the north-eastern Gawler Craton, between Roxby Downs and Coober Pedy, are being explored for possible buried economic IOCG style mineralisation. Research and interpretation completed by the licensee...-
Document
Published: 20 Nov 1918
-
Data release made in lieu of submitting a final report at the full surrender of EL 5285 Ingomar on 23/6/2018 : Jumbuck Project. Joint annual reports for the period 1/11/2013 to 31/10/2018.
A large area of the west-central Gawler Craton which is underlain by inferred gold-prone Archaean high grade metamorphosed rocks is being explored for Challenger style orogenic type lode gold that may have formed in the buried basement. The subject...-
Document
Published: 28 Dec 1918
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
The Adelaide Hills Project (now including the former Fleurieu Project tenements). Annual reports for the period 1/10/2013 to 30/11/2018 plus expiry/full surrender reports to 7/10/2023.
During the twelfth, 2013-2014 project year, work on the now combined licence holdings of the Terramin Group focussed on prospect evaluation done at Bird-in-Hand (environmental and hydrological studies), Wheal Barton and Golden Slope, plus the ongoing...-
Document
-
The Olympic Domain Project. Joint annual reports for the period 1/1/2011 to 31/12/2016, plus individual licence full surrender final reports.
During the sixth year of the project, three gravity anomalies located on West Lake Torrens EL 4754, a short distance east of the Carrapateena IOCG prospect, were identified by Copper Range as worthy of follow up. A detailed infill ground gravity...-
Document
Published: 01 Mar 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 1/1/2015 to 31/12/2018.
During the fourth year of project licences' joint reporting, for the Theseus Project, Endeavour undertook further RC and diamond core drilling at the Minos prospect on EL 5280, and did detailed auger calcrete geochemical sampling over the Lake...-
Document
Published: 21 Feb 1919
-
Indooroopilly, Muckanippie and Commonwealth Hill. Data release made in lieu of submitting a joint partial surrender report for ELs 5799, 6166 and 6348: all project licences' joint annual reports for the period 21/3/2015 to 30/6/2019.
An agglomeration of exploration licences which partly surrounds the Challenger gold deposit at distances of between 35 and 80 km is being explored for similar type economic lode gold mineralisation that may exist in buried Archaean bedrock relatively...-
Document
-
Princess Royal, Burra West, Burra North, Florieton, Mount Bryan, Burra Central, Mongolata, Redbanks, Hallett Hill and The Gums (the Burra Project tenement group). Joint annual reports for the period 1/5/2009 to 30/4/2017.
A multi-licence project area centred on the historic abandoned Burra copper mine is being explored for possible economic, buried Burra type copper oxide and copper carbonate mineralisation that may have formed within Neoproterozoic metasedimentary...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona JV Project area (including Benagerie and Kalkaroo). Combined annual reports for the period 10/5/2003 to 31/12/2007.
Ongoing exploration carried out by project operator Havilah Resources under its newly ratified, twelve exploration licence Curnamona Project Amalgamated Expenditure Agreement, for the period 15/10/2003 to 31/12/2004, consisted mainly of drilling done...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Andamooka Ranges, Island Dam and Stuart Shelf (part of the Stuart Shelf Project). Joint third partial surrender report, for the period 16/1/1981 to 25/9/2018.
There is a long history of exploration on the subject three Stuart Shelf tenements, with first tenure originally taken up in 1981. A summary of significant exploration activities conducted on the three now relinquished ground portions is believed by...-
Document
Published: 22 Nov 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : South Gawler Project. Joint annual technical report for the period 01/01/2017 to 31/12/2018.
Southern Gawler Ranges Project. This Report has been prepared by Terramin Australia Ltd on behalf of Menninnie Metals Pty Ltd (a 100% subsidiary of Terramin Australia Ltd). The Southern Gawler Ranges Project forms the eastern part of the Gawler...-
Document
-
Warrina North, Warrina South, Mount Brady, Yarrabolina Hill, Mount Woods and Kangaroo Dam (the Mount Woods JV Project). Joint annual reports [on JV partners' independent exploration programmes] for the period 1/5/2010 to 31/1/2017.
During the 2011-2012 project reporting period, exploration activities within the Mount Woods Project area which were conducted by OZL primarily targeted IOCG style mineralisation. Work included: · a continuation of office-based target generation and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : the Adelaide Hills Project. Joint annual reports for the period 16/5/2005 to 31/12/2013.
The Adelaide Hills Project consists of 3419 square km of land covered by eight contiguous exploration licences, ELs 3057, 3064, 3141, 3215, 3239, 3277, 3425 and 3534, which are owned by or joint ventured to Flinders Diamonds Limited (FDL). By an...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Port Augusta Project. Joint annual reports for the period 8/5/2013 to 7/5/2018 and subsequent expiry/full surrender reports to 6/10/2023.
Two small adjacent areas located 25 km north of Port Augusta, on the south-eastern Stuart Shelf close to the Torrens Hinge Zone, are being explored for possible buried economic IOCG style mineralisation which could have formed within inferred deep and...-
Document
Published: 14 Jul 1918
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : (for 10 exploration licences comprising) the Lake Torrens JV Project. Joint annual reports for the period 1/1/2007 to 31/12/2011.
A group of ten, mainly adjoining licence areas occupying the plains surrounding the northern end of Lake Torrens, are now being jointly explored for possible economic buried Olympic Dam style IOCG related mineralisation that may have formed in the...-
Document
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2006 to 28/8/2012.
Twelve licence areas owned and operated by Gold Fields Australasia (GFA), comprising two subareas respectively located approximately 50 km east of Burra and 15 km south-east of the Benda Range, on the eastern edge of the Adelaide Fold Belt, are being...-
Document
Published: 29 Sep 1912