-
Rehabilitation of Brukunga mine. Progress, final and miscellaneous reports for the period from November 1974 to April 1989.
There is no abstract created for this record-
Document
Published: 01 Jan 1989
-
RB 66/00119 Report on Nairne pyrite deposit, Brukunga, Hd Kanmantoo - Nairne Pyrites Pty Ltd.
In August 1966, a request for assistance with conducting pyritic sulphur exploration in the vicinity of Brukunga was received by the SA Department of Mines from Nairne Pyrites Pty Ltd. Brukunga is 29 miles east of Adelaide by road and 3.5 miles north...-
Document
Published: 01 Jan 1968
-
RB 74/00222 Amdel 01015 Rehabilitation of Brukunga mine, Nairne Pyrites Ltd.
This investigation of the Brukunga mine site was prompted by the observed release of acid waters with high iron and other heavy metal concentrations into Dawesley Creek, the consequences of which could include possible pollution of Lake Alexandrina...-
Document
Published: 01 Nov 1974
-
RB 2015/00019 Manual of geochemical leaching trials, 2010–2014; Brukunga Mine Remediation Program - Phase 3.
The Brukunga mine site is a former open pit iron sulfide mine that continues to contribute to Acid and Metalliferous Drainage (AMD) into downstream waterways. Mine-based sources of AMD include the waste rock dumps and tailings storage facility. In...-
Document
Published: 01 Jun 2015
-
RB 79/00023 Brukunga pyrite mine - Drillhole analyses and mine development plan inventory.
BHP have provided SADME with unpublished data on the inoperative Brukunga pyrite mine. This report is an inventory of these data, providing access to the mine development plans and analytical data on two diamond drill holes.-
Document
Published: 01 Jan 1979