-
1988 seismic survey, Gambier, final report.
AIM: The 1988 Gambier Seismic Survey of semi-detailed and regional data acquisition was shot principally to upgrade the prominent Glenburnie lead in the northeast of PEL 28 into a drillable prospect. This lead, identified 1n 1986 by the Burrungule...-
Document
-
1987 seismic survey, Orana, final report.
AIM: The 1987 Orana Seismic Survey, consisting of 14 lines with a total coverage of 55.6 line kms, was shot to further detail leads identified by the 1985 Burrungule Seismic Survey, other than the single lead (McNamara Prospect) which was confidently...-
Document
-
1986 seismic survey, Burrungule detail, operations report.
AIM: This seismic survey of 35 lines with a total coverage of 200.1 line kms was shot to further detail leads identified by the 1985 Burrungule Seismic Survey, and thereby attempt to upgrade at least two of them to drillable prospect status. The work...-
Document
-
1985 seismic survey, Burrungule, final report.
AIM: This seismic survey of 32 lines with a total 352.26 line kms coverage was conducted in the two most prospective areas of the licence in order to fulfil the Licence Year 1 work commitment of at least 250 line kms of seismic acquisition. The two...-
Document
-
1990 Kongorong (Experimental) Seismic Survey. Final geophysical report.
AIM: To ascertain whether existing seismic data obtained from beneath the Pebble Point Formation could be upgraded so that the primary reservoir, the Waarre Sandstone, might be mapped with a greater degree of confidence in the southern part of the...-
Document
-
PEL 28. Hydrocarbon habitat study.
This report, prepared as part of the renewed licence Year 6 exploration work commitment, summarises Beach Petroleums understanding of the geology of PEL 28 that is relevant to hydrocarbon exploration. From this it also points the way to future...-
Document